You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Low Ground Clearance Vehicle Detection and Warning System

    SBC: Intelligent Automation, Inc.            Topic: 131FR1

    The problem of low ground clearance vehicles being stuck at tracks of highway-rail grade crossings (HRGC) poses a severe safety risk. Vehicles with long wheelbases and low ground clearance are more likely to be stuck on high-profile HRGCs. Currently there is no commercially available automated system that detects and computes the necessary critical dimensions of low ground clearance vehicles (LGCV ...

    SBIR Phase I 2013 Department of Transportation
  2. Robotic Utility Mapping and Installation System (RUMI)

    SBC: Intelligent Automation, Inc.            Topic: 141FH3

    There is a need to develop new technologies that will robotically relocate existing overhead utilities to the subsurface within crowded rights-of-way in an accurate and safe manner, at an acceptable cost to the project’s owner, using construction methods such as Horizontal Directional Drilling (HDD). Intelligent Automation, Inc. (IAI), in collaboration with The Louisiana Tech Trenchless Technolo ...

    SBIR Phase I 2014 Department of Transportation
  3. Personalized Driving Data for Insurance Discounts & Public Benefits

    SBC: AGNIK LLC            Topic: 141FH2

    This proposal suggests research on developing the next generation of consumer experience for Usage Based Insurance (UBI) in an increasingly socially connected world while addressing the need to protect privacy. It will enhance Agnik’s current consumer and UBI products through the following innovations:  Collective Incentives and Game Theory: Explore the problem of risk modeling and underwriti ...

    SBIR Phase I 2014 Department of Transportation
  4. Low Ground Clearance Vehicle Detection and Warning System

    SBC: Advanced Technology And Research Corporation            Topic: 131FR1

    Highway-rail crossing, at which there is an unusually abrupt change in the level of the road's surface as it crosses the tracks, pose a risk of low ground clearance vehicles becoming stuck on the tracks. Advanced Technology and Research Corporation (ATR) proposes to develop an active detection and advance warning system. The system has three major functional componenets: measurement, decision, ...

    SBIR Phase I 2013 Department of Transportation
  5. Affliation Strength/Risk Model Development for Motor Carrier Succession

    SBC: Integrated Technology Solutions Inc.            Topic: 132FM1

    The vetting process, at FMCSA, is used to identify new entrant carriers with an affiliation to existing or defunct carriers which had safety fitness issues (chameleon or reincarnated carriers). Currently, the vetting process uses only data available within FMCSA. The current vetting process is staff intensive and costly. The goals of Phase 1 are to discover externally available: Data and tools tha ...

    SBIR Phase I 2014 Department of Transportation
  6. Low Profile Microwave Radar and WiFi Sensors for Visually Unobtrusive Vehicle Detection and Travel Time Monitoring

    SBC: Intelligent Automation, Inc.            Topic: 141FH5

    The major concern of National Park Service (NPS) is that the traffic sensors must be visually unobtrusive for minimizing the impact on viewsheds or the disturbance of the historical, cultural landscape. We propose an innovative visually unobtrusive vehicle detection and travel time monitoring system to provide high quality traffic and travel time information. The system is low cost, stand-alone, l ...

    SBIR Phase I 2014 Department of Transportation
  7. Aircraft Wiring Integrity Verification using Pseudo-random Binary Sequence

    SBC: Intelligent Automation, Inc.            Topic: N/A

    Our approach to aircraft wiring inspection is to inject a special type of low level probe signal into the cable to be tested. The system response to this special input can be used to give the complete transfer function of the cable. Our hypothesis is that incipient failures in the cable will be detectable as subtle changes in that transfer function, including discontinuities which cause signal r ...

    SBIR Phase I 2001 Department of Transportation
  8. A novel detection and warning system to mitigate dilemma zone (DZ) issues

    SBC: Intelligent Automation, Inc.            Topic: 082FH1

    Intelligent Automation Inc. (IAI) proposes an innovative and inexpensive solutions using In-roadway detectors and embedded pavement flashing light warning system to solve the dilemma zone (DZ) problem. Detection is performed by a pair of inductive loops in each travel lane, 800 to 1200 ft from intersection. The detection system includes prediction of vehicle travel time to the intersection and ...

    SBIR Phase I 2009 Department of Transportation
  9. A Novel Multi-Sensor Wireless Network for Bridge Structural Health Monitoring

    SBC: Intelligent Automation, Inc.            Topic: 081FH6

    The ability to monitor the condition of a bridge structure to detect damage or changes in condition at early stages is of significant interest to many bridge owners. Currently, the most widely used damage detection methods rely on subjective, incremental visual assessments or localized testing techniques. In this proposal, we propose to develop and test a bridge structural health monitoring syst ...

    SBIR Phase I 2009 Department of Transportation
  10. Automated High Speed, Low Water Consumption Insulator Cleaner

    SBC: MINI, LLC            Topic: 07FT4

    A novel third rail insulator cleaner and novel cleaning tool - the Spin Wedge, will be developed. The novel cleaner is a skate that rides directly on the third rail and is attached to a service vehicle. Four Spin Wedges, attached to the skate, direct a very rapid series of high pressure water jets arcs, like hammer blows, only on the surface to be cleaned. As the skate moves forward at high spe ...

    SBIR Phase I 2008 Department of Transportation
US Flag An Official Website of the United States Government