You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Enhanced Stability and Penetration Depth of Deep Earth Penetrators
SBC: GENERAL SCIENCES INC Topic: DTRA06009DTRA and other DoD agencies are currently seeking earth penetrators with higher efficiency for reaching deeply buried targets. Current penetrator materials and designs suffer from high levels of frictional drag, unbalanced resistance due to lateral forces and localized melting of the warhead leading to shape change and further instability. General Sciences, Inc. (GSI) has developed a method for en ...
SBIR Phase II 2008 Department of DefenseDefense Threat Reduction Agency -
The Characterization and Mitigation of Single Event Effects in Ultra-Deep Submicron (< 90nm) Microelectronics
SBC: Orora Design Technologies, Inc. Topic: DTRA07005Orora Design Technologies proposes to develop electronic design automation (EDA) tools employing minimally invasive circuit design-based methods to mitigate single event effects (SEEs) for next generation Ultra-DSM CMOS (
SBIR Phase II 2008 Department of DefenseDefense Threat Reduction Agency -
Advanced Technologies for Discrete-Parts Manufacturing
SBC: Modumetal, Inc. Topic: DLA07001The purpose of this SBIR effort is to commercialize an innovative method for the production of Modumetal™ discrete parts. The Phase I effort has demonstrated: (1) The low-cost production of monolithic parts of various scales using a net-shape (additive) manufacturing process, (2) An new production process in which cost and production volume are decoupled, and (3) Significant improvement in pr ...
SBIR Phase II 2008 Department of DefenseDefense Logistics Agency