You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 3515 results
  1. Intravascular Cardiac Assist System for Decompression and Recovery

    SBC: ABIOMED, INC.            Topic: NHLBI

    DESCRIPTION (provided by applicant): The objective of this proposal is to develop a less invasive long-term copulsation device to treat patients in late Class III and early Class IV stages of heart failure (HF). Chronic congestive heart failure is the largest unsolved problem in cardiac care today. There are over 5.5 million people in the United States with this diagnosis and the number of patient ...

    SBIR Phase II 2010 Department of Health and Human ServicesNational Institutes of Health
  2. A Novel Polymeric Percutaneous Heart Valve Prosthesis

    SBC: ABIOMED, INC.            Topic: NHLBI

    DESCRIPTION (provided by applicant): The objective of this SBIR program is the modification of a polymeric trileaflet heart valve to a valve prosthesis that can be delivered percutaneously as a transcatheter aortic valve replacement. Key innovations include improved durability and hemodynamic properties, lower manufacturing costs, and simplified delivery over existing transcatheter bioprosthetic v ...

    SBIR Phase I 2010 Department of Health and Human ServicesNational Institutes of Health
  3. Minimally Invasive Pediatric VAD for Treatment of Acute Heart Failure

    SBC: ABIOMED, INC.            Topic: NHLBI

    DESCRIPTION (provided by applicant): The overall objective of this proposed program is the commercialization of the Pediatric Impella system, a minimally invasive ventricular assist device (VAD) for treatment of acute heart failure in pediatric patients. The device will be a less traumatic alternative to extracorporeal membrane oxygenation (ECMO), the current standard of care for these patients. T ...

    SBIR Phase I 2010 Department of Health and Human ServicesNational Institutes of Health
  4. A Cognitive Systems Approach to Supporting Air Force Intelligence Analysis

    SBC: 361 INTERACTIVE LLC            Topic: AF093031

    United States intelligence analysts of today and tomorrow are faced with a paramount challenge of maintaining situation awareness in the midst of an ever-growing and changing capacity of available data. As the incoming data streams continue to expand, so do the expectations and requests placed on the analysts. Layered Sensing offers a promising solution to meeting the Intelligence, Reconnaissance ...

    SBIR Phase I 2010 Department of DefenseAir Force
  5. Demand Driven Healthcare Scheduling using Flexible Shifts and Monte-Carlo Simulat

    SBC: Acme Express, Inc.            Topic: NINR

    DESCRIPTION (provided by applicant): The shortage of nurses and medical technologists is accelerating. Shortages can be reduced by scheduling staff to precisely meet the hour-by-hour demand for medical service. Think of bank teller scheduling, where more staff are scheduled at peak demand. Current attempts to schedule to demand are relatively primitive: a small number of quantized fixed shifts, fo ...

    SBIR Phase II 2010 Department of Health and Human ServicesNational Institutes of Health
  6. Digital Analysis Computing Software Solutions for the Supply Chain

    SBC: ALTASIM TECHNOLOGIES LLC            Topic: SB092006

    Electrical circuit designers at Tier 2-4 suppliers to the Department of Defense (DoD) are currently using desktop computing to design their products. To improve the circuit design in the DoD supply chain, designers will need to be able to analyze their circuits with High Performance Computing resources. Designers seeking to innovate their circuits must have access to HPC facilities that maintain c ...

    SBIR Phase I 2010 Department of DefenseDefense Advanced Research Projects Agency
  7. Modeling and Simulation for Robust Ceramic Matrix Composite (CMC) Manufacturing Processes

    SBC: ALTASIM TECHNOLOGIES LLC            Topic: AF081038

    Increasing the power density of current jet aircraft engines requires the replacement of conventional high temperature materials by new materials capable of operating at higher temperatures. Ceramics and ceramic matrix composites (CMCs) represent excellent candidates for increased use in hot engine parts due to their ability to withstand temperatures in excess of 2000 C. Due to the complexity of t ...

    SBIR Phase II 2010 Department of DefenseAir Force
  8. A functional and multimodal biofeedback device to treat balance dysfunction in mTBI patients.

    SBC: Advanced Mechanical Technology, Inc.            Topic: OSD09H22

    According to existing data, there are more than 1.5 million of Americans sustaining a Traumatic Brain Injury (TBI) each Year. Balance disorders represent one of the main regular problems that patients have to deal with, and thus everyday. Rehabilitation programs do exist but they are dependable of the clinician or physiotherapist and they do not take in account the multimodal aspects of balance co ...

    SBIR Phase I 2010 Department of DefenseArmy
  9. Thermoelectric-Powered Field Kitchen Appliances

    SBC: Advanced Mechanical Technology, Inc.            Topic: A09162

    Cooking appliances in U.S. Army field kitchens are currently heated by burning JP-8 fuel using electrically powered burners. Power is supplied by a separate JP-8 fired generator that serves multiple appliances simultaneously. This is inefficient, as generators are only 20-25% efficient, and unreliable since failure of the generator results in the failure of the entire kitchen operation. This is a ...

    SBIR Phase I 2010 Department of DefenseArmy
  10. Airworthy Cable Angle Measurement System For Slung Load Operations

    SBC: Advanced Optical Systems, Inc            Topic: A09013

    Advanced Optical Systems, Inc. (AOS) has developed and demonstrated the Cable Angle Measurement System, a low-cost, accurate system for measuring a helicopter’s load position and motion at the end of an external sling. By using a camera, an LED target, and custom electronics, the AOS system measures the load’s angle with better than 0.1° accuracy across a 150° field of view and with 0.1°/s ...

    SBIR Phase II 2010 Department of DefenseArmy
US Flag An Official Website of the United States Government