You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. THE RESEARCH HEREIN PROPOSED IS INTENDED TO ADDRESS THE CONTINUING PROBLEM OF ESTIMATING SOFTWARE COSTS OVER THE LIFE OF LARGE AND COMPLEX SOFTWARE PROJETS.

    SBC: Aquidneck Management Associate            Topic: N/A

    THE RESEARCH HEREIN PROPOSED IS INTENDED TO ADDRESS THE CONTINUING PROBLEM OF ESTIMATING SOFTWARE COSTS OVER THE LIFE OF LARGE AND COMPLEX SOFTWARE PROJETS. THE RESEARCH WILL ADDRESS ALL FACTORS THAT AFFECT SOFTWARE COSTS FROM A FUNCTIONAL STANDPOINT AS OPPOSED TO THE TRADITIONAL LINES-OF-CODE (PROGRAM SIZE) APPROACH. THE FACTORS WILL BE TRANSLATED INTO A MODEL THAT EMPHASIZES THE IMPORTANCE OF IN ...

    SBIR Phase I 1983 Department of DefenseAir Force
  2. THIS PROJECT CONCERNS A UNIQUE APPROACH TO THE PRODUCTION OFHIGH ENERGY PRODUCT MAGNETS EMPLOYING RAPID SOLIDIFICATION METHODS.

    SBC: Stam Inc.            Topic: N/A

    THIS PROJECT CONCERNS A UNIQUE APPROACH TO THE PRODUCTION OFHIGH ENERGY PRODUCT MAGNETS EMPLOYING RAPID SOLIDIFICATION METHODS. RIBBONS OF RARE EARTH-COBALT ALLOYS ARE RAPIDLY SOLIDIFIED TO PRODUCE A MICRON-SIZED COLUMNAR MICROSTRUCTUREAND THE COERCIVE FORCE DURING MAGNETIZATION IS CONTROLLED BY DOMAIN NUCLEATION MECHANISM. THIS EFFORT PRODUCES HIGH- CURIE-POINT, HIGH-ENERGY-PRODUCT PERMANENT MAGN ...

    SBIR Phase I 1983 National Aeronautics and Space Administration
  3. SEA WATER BATTERIES

    SBC: Stam Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseDefense Advanced Research Projects Agency
  4. TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.

    SBC: The Associated Corp            Topic: N/A

    TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...

    SBIR Phase I 1984 Department of DefenseNavy
  5. RESEARCH RELATED TO DEVELOPING A VISUAL TESTING DEVICE

    SBC: Q-t Products Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Health and Human Services
  6. SEA WATER BATTERIES

    SBC: Stam Inc.            Topic: N/A

    THIS PROPOSAL DESCRIBES A PROGRAM FOR THE DEVELOPMENT OF SUPERIOR SEA WATER BATTERIES INCORPORATING RAPIDLY SOLIDIFIED AMORPHOUS PALLADIUM-SILICON CATHODES AND RAPIDLY SOLIDIFIED CRYSTALLINE ALUMINUM ALLOY ANODES. THE SEA WATERBATTERY PERFORMANCE WILL BE EVALUATED AND THE CORROSION CHARACTERISTICS OF THE ANODE WILL BE CORRELATED WITH THE MICROSTRUCTURE AND ALLOY COMPOSITION OF THE ANODE MATERIAL. ...

    SBIR Phase II 1984 Department of DefenseDefense Advanced Research Projects Agency
  7. TAC PROPOSES TO STUDY THE FEASIBILITY OF DETECTION AND LOCALIZING OIL DRUM SIZE OBJECTS ON/IN THE BOTTOM OF SURF ZONES.

    SBC: The Associated Corp            Topic: N/A

    TAC PROPOSES TO STUDY THE FEASIBILITY OF DETECTION AND LOCALIZING OIL DRUM SIZE OBJECTS ON/IN THE BOTTOM OF SURF ZONES. THE APPROACH IS TO ANALYZE THE PERFORMANCE PROBABILITIES AND DESIGN FEASIBILITY OF LOW FREQUENCY (20 TO 500 HZ) ACTIVE ELECTROMAGNETIC DESIGNS IN A TOWABLE, SUBMERGED HYDROFOIL CONFIGURATION. DETECTION SYSTEMS WOULD BE SUPPLEMENTED FOR LOCALIZATION BY EITHER NAVIGATIONAL FIX METH ...

    SBIR Phase I 1985 Department of DefenseNavy
  8. A STUDY IS PROPOSED WHICH WILL DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER BASED MODEL FOR ADMINISTERING ASSESSMENT AND THERAPY TO MENTALLY RETARDED/DEVELOPMENTALLY DISABLED INFANTS AND CHILDREN.

    SBC: Handicapped Childrens Technolo            Topic: N/A

    A STUDY IS PROPOSED WHICH WILL DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER BASED MODEL FOR ADMINISTERING ASSESSMENT AND THERAPY TO MENTALLY RETARDED/DEVELOPMENTALLY DISABLED INFANTS AND CHILDREN. THE PRINCIPAL AIM OF PHASE I IS TO SURVEY CURRENT TECHNOLOGIES AS THEY RELATE TO THERAPY AND PROVIDE A BASIS FOR A PHASE II RESEARCH PLAN. HARDWARE AND SOFTWARE BASED SIMULATION OF A MODEL WILL BE ...

    SBIR Phase I 1985 Department of Health and Human Services
  9. LIPID INCORPORATED SERUM-FREE MEDIUM

    SBC: Oncology Laboratorytory, In            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Health and Human Services
  10. RESEARCH RELATED TO DEVELOPING A VISUAL TESTING DEVICE

    SBC: Q-t Products Inc.            Topic: N/A

    QUALITATIVE ADVANCES IN COMPUTER TECHNOLOGY HAVE LEVELED OFF SUFFICIENTLY TO JUSTIFY THE DEVELOPMENT OF A MULTI-USER, MULTI-FUNCTION, COMPREHENSIVE VISUAL TESTING INSTRUMENT FOR OPHTHALMOLOGISTS, VISUAL SCIENTISTS, AND OPTOMETRISTS. SUCH A SYSTEM COULD BE DEVELOPED WITH RELATIVE EASE WERE IT NOT FOR THE INDUSTRY STANDARD REFRESH RATE FOR GENERATING VIDEO IMAGES. UNFORTUNATELY, 60 HZ IS TOO SLOW FO ...

    SBIR Phase II 1985 Department of Health and Human Services
US Flag An Official Website of the United States Government