You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. 3-D Woven Conformal Antenna Structures

    SBC: Applied Radar, Inc.            Topic: AF05238

    New missions require that airborne radars operate at increasing ranges with higher target resolution. This combination necessitates the cost-effective deployment of large apertures while maintaining aerodynamic performance. Externally mounted antenna arrays are not a satisfactory solution due to the large size at low frequencies, for example with UHF foliage penetration radar. Another approach emp ...

    SBIR Phase II 2006 Department of DefenseAir Force
  2. X-Band Multi-Channel Digital Beamforming Transmit Array Employing both Waveform Agility and Spatial Diversity

    SBC: Applied Radar, Inc.            Topic: N/A

    "A multi-channel transmit array is to be developed for high-speed digital communications and radar applications. Digital beamforming (DBF) will be combined with direct digital synthesis (DDS) waveform generation to achieve a system capable of using bothwaveform diversity and spatial diversity. Multiple simultaneous transmit beams will be generated that may be configured and scanned digitally. Usin ...

    SBIR Phase I 2002 Department of DefenseAir Force
  3. Drilling 170 Micron Diameter Holes

    SBC: LASER FARE ADVANCED TECHNOLOGY GROUP            Topic: N/A

    "The U.S. Air Force must develop the ability to rapidly drill many millions of 170 micron diameter holes through metal plates, to form injector heads as part of its ABL program. The holes must be high quality, non-invasive to the surrounding metal, and theprocess must be less labor and time intensive than present methods. As discussed in this proposal the physics of material removal with pulsed ...

    SBIR Phase I 2002 Department of DefenseAir Force
US Flag An Official Website of the United States Government