You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Flight Video Recording and Transmission System

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    Not Available A program to demonstrate the feasibility of a single multi-hyperspectral infrared sensor capable of both missile threat warning and subpixel ground target detection is proposed. The effort will first identify candidate spectral bands/subbands for both missile threat warning and subpixel ground target detection applications. From these results, clutter rejection and subpixel target d ...

    SBIR Phase I 1999 Department of Transportation
  2. Signal State Transition Software Development

    SBC: Advanced Technologies, Inc            Topic: N/A

    Advance Technologies is proposing a formal software development effort to translate the State Transition Logic algorthims developed under NCHRP Project 3-66. We are proposing the use of free software such as GNAT, Linux and Umbrello to assist us in the software development. Advanced Technologies has been developing real time, safety critical, Ada83/Ada95 software for twenty years. We plan to use U ...

    SBIR Phase I 2006 Department of Transportation
  3. METHODOLOGY FOR CORRELATION OF ATC CONTROLLER WORKLOAD AND ERRORS

    SBC: Computer Technology Associates            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of Transportation
  4. ADVANCED FARE PAYMENT MEDIA

    SBC: Echelon Industries Inc.            Topic: N/A

    THE FEASIBILITY OF SMART CARDS FOR THE PUBLIC TRANSIT INDUSTRY HAS NOT BEEN ESTABLISHED. THERE IS A PERCEPTION THAT SMART CARDS CAN BE USED TO REDUCE THE TOTAL TRANSACTIONCOSTS ASSOCIATED WITH FARE PAYMENT, TO IMPROVE SECURITY, REDUCE FRAUD AND IMPROVE SYSTEM PERFORMANCE AND RIDERSHIP. THE OBJECTIVE OF THIS PROGRAM IS TO DETERMINE THE APPROPRIATENESS OF THESE CLAIMS; THIS WILL BE ACCOMPLISHED BY R ...

    SBIR Phase II 1993 Department of Transportation
  5. EXPLOSIVES DETECTION WITH A HAND-HELD FOURIER TRANSFORM ION MOBILITY SPECTROMETER

    SBC: Femtometrics, Inc.            Topic: N/A

    EXPLOSIVE DETECTION CAPABILITIES AT MOST AIRPORTS CONSIST OF MAGNETOMETERS AND X-RAY EQUIPMENT THAT WERE DESIGNED TO DETECT HANDGUNS. U.S. PUBLIC LAW 101-604 WAS ENACTED AFTER THE PAN AM 103 INCIDENT WHICH DICTATES THAT IN ADDITION TO CARRY-ON LUGGAGE, CHECKED BAGS, MAIL AND CARGO MUST BE MONITORED PRIOR TO BEING LOADED ONTO AN AIRCRAFT. THE CANDIDATE DETECTION TECHNOLOGIESMUST ALSO BE TESTED BY A ...

    SBIR Phase I 1992 Department of Transportation
  6. THIS PROPOSAL DESCRIBES THE NOVEL CONCEPT OF USING INNOCUOUSENERGY SOURCES TO ENHANCE THE DESORPTION, FROM CLOTHING SURFACES, OF CHEMICAL VAPORS ASSOCIATED WITH EXPLOSIVES.

    SBC: First Omega Group Inc            Topic: N/A

    THIS PROPOSAL DESCRIBES THE NOVEL CONCEPT OF USING INNOCUOUSENERGY SOURCES TO ENHANCE THE DESORPTION, FROM CLOTHING SURFACES, OF CHEMICAL VAPORS ASSOCIATED WITH EXPLOSIVES. THEFIRST OMEGA GROUP, INC. PROPOSES TO DEMONSTRATE THE SUIT- ABILITY OF THIS CONCEPT WHICH WOULD ENABLE THE CONSTRUCTION OF EQUIPMENT THAT CAN BE LOCATED AT AIRPORT PASSENGER SCREENING AREAS. THE DEVICE IS EXPECTED TO ENCOURAGE ...

    SBIR Phase I 1986 Department of Transportation
  7. CRITICAL SECTOR DETECTOR TOOL

    SBC: Iat            Topic: N/A

    THE PROPOSED PHASE I WORK WILL DEVELOP A CRITICAL SECTOR DETECTOR TOOL CONCEPT THAT WORKS. THE TOOL WILL EVALUATE AIR TRAFFIC CONTROLLER WORKLOAD. IT WILL ANALYZE THE TASK REQUIREMENTS OF HUMAN CONTROLLERS, CALCULATE WORKLOAD FOR THE VARIOUS CONTROLLER POSITIONS OF A SECTOR TEAM, AND COMPARE WORKLOAD ESTIMATES WITH SATURATION LIMITS TO IDENTIFY POTENTIAL OVERLOADS. IT WOULD ALLOW AIR TRAFFIC CONTR ...

    SBIR Phase II 1992 Department of Transportation
  8. Integration of Advanced Inductive Signature Vehicle Detectors with an Advanced Transportation Controller running under the Real Time Linux Operating System

    SBC: Inductive Signature Technologies Inc.            Topic: N/A

    We propose to determine what outputs from the SSAJ measurement system would be suitable for traffic control applications, to determine what the "real time" needs and accuracies are for measurements of signature, speed, acceleration, and jerk (SSAJ), to integrate the output of our IST-222 Standard Signature Output Card with and Advanced Transportation Contorller (ATC) and finally to demonstrate pro ...

    SBIR Phase I 2006 Department of Transportation
  9. MEASURING RETROREFLECTIVITY OF PAVEMENT MARKINGS

    SBC: Advanced Retro Technology Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of Transportation
  10. LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of Transportation
US Flag An Official Website of the United States Government