You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
PHOTOINTERCALATION SOLID ELECTROLYTE STORAGE CELL
SBC: ELTRON RESEARCH & DEVELOPMENT, INCORPORATED Topic: N/ATHE PROPOSED PROGRAM IS DIRECTED TOWARDS EVALUATING THE TECHNICAL FEASIBILITY OF APPLYING SOLID POLYMER ELECTROLYTES (SPE) IN NOVEL ALL SOLID-STATE PHOTOELECTROCHEMICAL STORAGE CELLS. THE UNIQUENESS OF THIS APPROACH LIES IN THE USE OF PHOTOCATHODES WHICH WILL HAVE THE POTENTIAL TO NOT ONLY GENERATE REDUCED REDOX SPECIES, AT THEIR INTERFACE WITH THE SOLID ELECTROLYTE, BUT ALSO WILL STORE SUCH SPECI ...
SBIR Phase II 1985 Department of DefenseNavy -
METHOD & DEVICE FOR NONDESTRUCTIVE INSPECTION OF NIOBIUM TO IMPROVE SUPERCONDUCTIVITY
SBC: Sonoscan Inc Topic: N/AA NONDESTRUCTIVE TEST DEVICE WILL BE DEVELOPED TO INSPECT NIOBIUM PLATES AND NIOBIUM WELDS FOR DEFECTS WHICH CAUSE ITS SUPERCONDUCTING PROPERTIES TO BE QUENCHED. HIGH QUALITY NIOBIUM IS REQUIRED FOR ADVANCED MACHINES SUCH AS FUTURE GENERATION RADIO FREQUENCY PARTICLE ACCELERATORS. AT PRESENT, THERE IS NO ESTABLISHED TECHNIQUE FOR LOCATING AND DIFFERENTIATING THE TYPES OF DEFECTS CRITICAL TO SUPERC ...
SBIR Phase II 1985 Department of Energy