You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. TAC PROPOSES TO STUDY THE FEASIBILITY OF DETECTION AND LOCALIZING OIL DRUM SIZE OBJECTS ON/IN THE BOTTOM OF SURF ZONES.

    SBC: The Associated Corp            Topic: N/A

    TAC PROPOSES TO STUDY THE FEASIBILITY OF DETECTION AND LOCALIZING OIL DRUM SIZE OBJECTS ON/IN THE BOTTOM OF SURF ZONES. THE APPROACH IS TO ANALYZE THE PERFORMANCE PROBABILITIES AND DESIGN FEASIBILITY OF LOW FREQUENCY (20 TO 500 HZ) ACTIVE ELECTROMAGNETIC DESIGNS IN A TOWABLE, SUBMERGED HYDROFOIL CONFIGURATION. DETECTION SYSTEMS WOULD BE SUPPLEMENTED FOR LOCALIZATION BY EITHER NAVIGATIONAL FIX METH ...

    SBIR Phase I 1985 Department of DefenseNavy
  2. FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE

    SBC: Coin Systems Inc            Topic: N/A

    FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE MIS-HANDLING, EMPLOYEE FRAUD, EMPLOYEE THEFT. THIS STUDY WILL FOCUS ON THE FEASIBILITY OF IMPLEMENTING T THE ELECTRONIC/MICRO PROCESSOR BASED COLLECTION ...

    SBIR Phase I 1985 Department of Transportation
  3. INDIRECT ANTILASER EYE PROTECTION SYSTEM

    SBC: Delphi Research Inc            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseNavy
  4. PHOTOINTERCALATION SOLID ELECTROLYTE STORAGE CELL

    SBC: ELTRON RESEARCH & DEVELOPMENT, INCORPORATED            Topic: N/A

    THE PROPOSED PROGRAM IS DIRECTED TOWARDS EVALUATING THE TECHNICAL FEASIBILITY OF APPLYING SOLID POLYMER ELECTROLYTES (SPE) IN NOVEL ALL SOLID-STATE PHOTOELECTROCHEMICAL STORAGE CELLS. THE UNIQUENESS OF THIS APPROACH LIES IN THE USE OF PHOTOCATHODES WHICH WILL HAVE THE POTENTIAL TO NOT ONLY GENERATE REDUCED REDOX SPECIES, AT THEIR INTERFACE WITH THE SOLID ELECTROLYTE, BUT ALSO WILL STORE SUCH SPECI ...

    SBIR Phase II 1985 Department of DefenseNavy
  5. IMI-TECH CORPORATION PROPOSES TO DETERMINE THE FEASIBILITY OF MEETING THE NAVY'S NEED FOR A POURED-IN-PLACE, LIGHTWEIGHT FLOTATION FOAM THAT WILL NOT SUSTAIN COMBUSTION, DOES NOT RELEASE HAZARDOUS AMOUNTS OF TOXIC GASES WHEN EXPOSED TO FLAMES, AND HAS

    SBC: Imi-tech Corp            Topic: N/A

    IMI-TECH CORPORATION PROPOSES TO DETERMINE THE FEASIBILITY OF MEETING THE NAVY'S NEED FOR A POURED-IN-PLACE, LIGHTWEIGHT FLOTATION FOAM THAT WILL NOT SUSTAIN COMBUSTION, DOES NOT RELEASE HAZARDOUS AMOUNTS OF TOXIC GASES WHEN EXPOSED TO FLAMES, AND HAS LOW WATER ABSORPTION. THE TECHNOLOGY TO MEET THIS REQUIREMENT, WITHOUT THE USE OF TOXIC GAS-PRODUCING FLAME RETARDANTS, EXISTS AT IMI-TECH TODAY. TH ...

    SBIR Phase I 1985 Department of DefenseNavy
  6. ELECTROLYTIC STERILIZATION OF POTABLE WATER ON SHIPBOARD

    SBC: Los Alamos Technical Assocs In            Topic: N/A

    A SAFE, AESTHETICALLY ACCEPTABLE POTABLE WATER SUPPLY CAN BE PRODUCED ON SHIPBOARD BY ELECTROLYTICALLY GENERATING OZONE AND CHLORINE DIRECTLY IN THE WATER SUPPLY. THIS METHOD DOES NOT REQUIRE A SUPPLY OF HEAVY, HAZARDOUS CHEMICALS BUT GENERATES OZONE AND CHLORINE ELECTROLYTICALLY FROM SEA WATER AT AMBIENT TEMPERATURES, REQUIRING LITTLE POWER. OZONE AND CHLORINE IN COMBINATION ARE EXTREMELY EFFECTI ...

    SBIR Phase II 1985 Department of DefenseNavy
  7. LONGITUDINAL STRESS (FORCE) MEASUREMENT OF RAIL UNDER OPERATING CONDITIONS

    SBC: Magnasonics Inc            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Transportation
  8. WE PROPOSE TO MEASURE ICE THICKNESS FROM A SUBMERGED SUBMARINE BY MEASURING THE ATTENUATION OF THE COSMIC RAY PRODUCED NETURON FLUX.

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    WE PROPOSE TO MEASURE ICE THICKNESS FROM A SUBMERGED SUBMARINE BY MEASURING THE ATTENUATION OF THE COSMIC RAY PRODUCED NETURON FLUX. A SIMILAR TECHNIQUE HAS BEEN USED SUCCESSFULLY TO MEASURE SNOW THICKNESS. TWO NEUTRON DECTORS, POSSIBLE BF3, WOULD OPERATE IN COINCIDENCE MODES TO REDUCE BACKGROUND CONTRIBUTIONS. THE DETECTION GEOMETRY WOULD DETERMINE THE APERTURE AND, THEREFORE, SIZE OF ICE AREA ME ...

    SBIR Phase I 1985 Department of DefenseNavy
  9. SOLID-STATE DOPPLER WIND SENSOR

    SBC: Sailcomp Industries Inc.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseNavy
  10. Future observation of near shore environments will increasingly depend upon flexible, affordable, high performance devices operating as components of autonomous distributed systems. Mine detection, coastal monitoring and environmental measurement can

    SBC: Tetra Corporation            Topic: N/A

    N/A

    SBIR Phase II 1985 Department of DefenseNavy
US Flag An Official Website of the United States Government