You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. FOURIER DOMAIN TECHNIQUE TO COMPUTE TOMOGRAPHY SCANNER WITH DIGITAL RADIOGRAPHY CAPABILITY

    SBC: BIO-IMAGING RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseNavy
  2. COMPOSITE MATERIALS GUIDANCE FOR SUBMARINE

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    COMPOSITE MATERIALS OFFER A WIDE RANGE OF ATTRIBUTED THAT CAN IMPROVE THE PERFORMANCE AND REDUCE THE COST OF NEW SUBMARINES. COMPOSITES HAVE NOT YET BEEN USED EXTENSIVELY IN SUBMARINES BECAUSE THERE IS LITTLE EXPERIENCE IN THE SUBMARINE ENGINEERING COMMUNITY ON WHICH TO BASE COMPONENT DESIGN. COMPOSITES, UNLIKE METALS, HAVE A VERY LIMITED BODY OF DESIGN GUIDANCE SPECIFICALLY ORIENTED TO SUBMARINE ...

    SBIR Phase II 1992 Department of DefenseNavy
  3. Format D Battery Module

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    1Reliable and continuous power to submarine electronics is essential for mission execution and for the safe operation of the ship. Digital electronics cannot continue operation through even very short power outages cause by bus transfer devices that have historically been sufficient for analog combat systems. The restart and reload that a digital system must execute after a short power interruptio ...

    SBIR Phase I 1992 Department of DefenseNavy
  4. A Flexible Concurrent Design System for Rapid Prototype Manufacturing

    SBC: Engineering Geometry Systems            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseNavy
  5. PASSIVE FIBER OPTIC COMPONENTS FOR SEVERE ENVIRONMENTS

    SBC: Forss            Topic: N/A

    WE PROPOSE TO DEVELOP A MULTI-CHANNEL FIBER OPTIC INTERCONNECTION DEVICE THAT CAN WITHSTAND THE SEVERE CONDITIONS OF THE MILITARY AIRCRAFT ENVIRONMENT. THE PROPOSED INTERCONNECT DEVICE CONSISTS OF AN ADAPTER AND A CONNECTOR FOR RIBBON FIBERS OR MULTI-CHANNEL CABLES. THIS DEVELOPMENTAL ACTIVITY WILL FOCUS ON ADVANCED TECHNOLOGIES AND ADVANCED ENGINEERING MATERIALS. SPECIFICALLY, WE INTEND TO USE ET ...

    SBIR Phase II 1992 Department of DefenseNavy
  6. LOW COST MAGNETIC ATTITUDE HEADING REFERENCE SYSTEMS (M-AHRS) FOR AUTONOMOUS FLIGHT VEHICLES EFFEC

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseNavy
  7. LOW COST MULTI-SPECTRAL SUB-SONIC RADOME

    SBC: LINDSEY ASSOC.            Topic: N/A

    Low cost methods and materials will be evaluated for the design and manufacture a 2 to 18 GHz radome which will provide sub-sonic environmental protection for a 4-arm spiral antenna and which will also be optically transparent. Canididate materials will include but not be limited to the following matterials: borosilicate glasses, polycarbonates and amorphous fluoropolymers. Radome wall designs wil ...

    SBIR Phase II 1992 Department of DefenseNavy
  8. LOW COST MULTI-SPECTRAL SUB-SONIC RADOME

    SBC: LINDSEY ASSOC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseNavy
  9. DIGITAL TANGENTIAL X-RAY SCANNER FOR LOADED ROCKET MOTORS

    SBC: Omega International Technology, Inc.            Topic: N/A

    FOR THE LARGE LOADED ROCKET MOTORS, THE ROCKET FUEL IS MOSTLY EXAMINE AT PRESENT BY TAKING MANY SELECTED TANGENTIAL X-RAY FILM EXPOSURES WITH HIGH ENERGY (ACCELERATOR TYPE) X-RAY SOURCE. THESE TANGENTIAL X-RAY EXPOSURE FILMS ARE INTERPRETED BY AN EXPERT RADIOGRAPHER FOR ANY ANOMALY OR PROBLEMS. THIS PROCEDURE HAS POOR VOID AND CRACK DETECTABILITY, IS SLOW AND CUMBERSOME AND REQUIRES MANUAL INTERPR ...

    SBIR Phase II 1992 Department of DefenseNavy
  10. ADVANCED TOWED ARRAY HANDLING

    SBC: Product Planning, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseNavy
US Flag An Official Website of the United States Government