You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.

    SBC: The Associated Corp            Topic: N/A

    TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...

    SBIR Phase I 1984 Department of DefenseNavy
  2. INVESTIGATION OF FUNCTIONAL PROGRAMMING IN DEFENSE APPLICATIONS

    SBC: Computer Technology Associates            Topic: N/A

    THE DOD SOFTWARE INITIATIVE CLEARLY IDENTIFIED THE CHALLENGES FOR FUTURE SYSTEMS. THEY WILL HAVE TO BE LARGER AND MORE COMPLEX, DEVELOPED AND DELIVERED MORE RAPIDLY, AND MAINTAINED OVER LONGER PERIODS. TRADITIONAL PROGRAMMING TECHNIQUES, HOWEVER, APPEAR TO HAVE REACHED THEIR LIMITS, MAKING MUCH LARGER SOFTWARE SYSTEMS VIRTUALLY IMPOSSIBLE TO BUILD AND MAINTAIN. AN ALTERNATIVE APPROACH, CALLED FUNC ...

    SBIR Phase II 1984 Department of DefenseNavy
  3. TO DETERMINE THE FEASIBILTY OF DESIGNING A COMPUTER-AIDED SYSTEM THAT WOULD PROVIDE AN ESTIMATE OF A REASONABLE COST FOR SPARE AND REPAIR PARTS.

    SBC: G.k.s., Inc.            Topic: N/A

    TO DETERMINE THE FEASIBILTY OF DESIGNING A COMPUTER-AIDED SYSTEM THAT WOULD PROVIDE AN ESTIMATE OF A REASONABLE COST FOR SPARE AND REPAIR PARTS. THE PROJECT WILL ADDRESS THE FEASIBILITY OF PROVIDING TWO METHODS OF PRICE DETERMINATIN FOR COMPARISON PURPOSES. THE PRO POSAL WILL LIMIT ITS APPLICATIONS TO SPECIFIC FEDERAL STOCK CLASSES.

    SBIR Phase I 1984 Department of DefenseNavy
  4. EVALUATION OF LOW CYCLE FATIGUE AND COATINGS WITH THE KET GAS PENETRANT INSPECTION PROCESS

    SBC: Qual-x, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  5. RAILROAD RAILS AND CAR WHEELS SUFFER MECHANICAL WEAR THROUGH USE, AND THIS WEAR IS A MAJOR MAINTENANCE EXPENSE ITEM FOR MOST RAILROADS.

    SBC: Tribo Materials Dev. Corp.            Topic: N/A

    RAILROAD RAILS AND CAR WHEELS SUFFER MECHANICAL WEAR THROUGH USE, AND THIS WEAR IS A MAJOR MAINTENANCE EXPENSE ITEM FOR MOST RAILROADS. IT HAS BEEN SHOWN THAT SUBSTANTIAL REDUCTION IN WEAR CAN BE ACHIEVED THROUGH LUBRICATION, ALTHOUGH THE LUBRICATORS THEMSELVES ARE A MAINTENANCE PROBLEM. IT IS PROPOSED TO DEVELOP AN ANTI-WEAR COATING WHICH CAN BE APPLIED PERIODICALLY TO RAILS TO REDUCE WEAR AND TO ...

    SBIR Phase I 1984 Department of Transportation
  6. COMPUTER-BASED DEVELOPMENT OF STEAM PROPULSION PLANT OPERATOR TRAINING (SPPOT) MATERIALS

    SBC: UES INC            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
US Flag An Official Website of the United States Government