You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.

    SBC: The Associated Corp            Topic: N/A

    TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...

    SBIR Phase I 1984 Department of DefenseNavy
  2. THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS.

    SBC: Autoflex, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS. THE FOCUS OF THE RESEARCH IS TO CONTROL THE ROBOT TOOL CONTROL POINT (TCP) THROUGH AN ADAPTIVE FEEDBACK CONTROL SYSTEM. THE ROLE OF THE FEEDBACK CONTROL SYSTEM IS TO CONTROL AND MODIFY THE PATH OF THE TCP TO WIT ...

    SBIR Phase I 1984 Department of DefenseNavy
  3. THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO

    SBC: Autoflex, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO FRAME RATES OF 30 FRAMES PER SECOND. THE SYSTEM CONFIGURATION UNDER INVESTIGATION WILL UTILIZE PARALLEL PROCESSING OF RAW VIDEO INPUT FROM MULTIPLE C ...

    SBIR Phase I 1984 Department of DefenseNavy
  4. TO DETERMINE THE FEASIBILTY OF DESIGNING A COMPUTER-AIDED SYSTEM THAT WOULD PROVIDE AN ESTIMATE OF A REASONABLE COST FOR SPARE AND REPAIR PARTS.

    SBC: G.k.s., Inc.            Topic: N/A

    TO DETERMINE THE FEASIBILTY OF DESIGNING A COMPUTER-AIDED SYSTEM THAT WOULD PROVIDE AN ESTIMATE OF A REASONABLE COST FOR SPARE AND REPAIR PARTS. THE PROJECT WILL ADDRESS THE FEASIBILITY OF PROVIDING TWO METHODS OF PRICE DETERMINATIN FOR COMPARISON PURPOSES. THE PRO POSAL WILL LIMIT ITS APPLICATIONS TO SPECIFIC FEDERAL STOCK CLASSES.

    SBIR Phase I 1984 Department of DefenseNavy
  5. DEVELOPMENT OF A RUGGEDIZED LOW COST MICROCOMPUTER

    SBC: Kms Fusion Inc            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  6. NON-METALLIC MATERIALS

    SBC: Patel Engineers            Topic: N/A

    THE ARRHENIUS METHODOLOGY IS CURRENTLY ACCEPTED AS STATE-OF-THE-ART IN THE REALM OF PREDICTING THERMAL LIFE ON NON-METALLIC MATERIALS. APPLICATION OF THE ARRHENIUS METHODOLOGY REQUIRES THE AVAILABILITY OF EMPIRICAL LIFE TESTING DATA, WHICH MAY BE GENERATED FOR A VARIETY OF PHYSICAL/ELECTRICAL PROPERTIES FOR ANY GIVEN MATERIAL. A LARGE QUANTITY OF SUCH DATA HAS BEEN GENERATED BY A MULTITUDE OF SOUR ...

    SBIR Phase I 1984 Department of DefenseNavy
  7. RECYCLING OF DUST FROM ELECTRIC ARC FURNACES

    SBC: Pei Associates Inc            Topic: N/A

    THE MAJOR SHORTCOMINGS OF THE VARIOUS PROCESSES SUGGESTED BY RECYCLING METALLURGICAL DUST HAVE BEEN THE HIGH CAPITAL COST OF THE EQUIPMENT AND THE NEED FOR LARGE QUANTITIES OF DUST FOR THE PROCESSES TO BE ECONOMICAL. ELECTRIC ARC FURNACE DUST IS NOT AMENABLE TO THESE PROCESSES BECAUSE IT IS GENERATED IN SMALL QUANTITIES AND A LARGE NUMBER OF LOCATIONS, DISTANT FROM INDUSTRIAL CENTERS WHERE REGIONA ...

    SBIR Phase II 1984 Environmental Protection Agency
  8. THE INCREASED RELIANCE OF THE POWER INDUSTRY ON U.

    SBC: Pei Associates Inc            Topic: N/A

    THE INCREASED RELIANCE OF THE POWER INDUSTRY ON U.S. COAL RESERVES IS THREATENED BY AN OVERALL DECLINE IN THE DEMAND OF POWER, THE HIGH COST OF FINANCING NEW PLANTS, MORE STRINGENT REGULATORY REQUIREMENTS, AND INEFFICIENT ENERGY RECOVERY AND POLLUTION CONTROL. CONVENTIONAL AND ESTABLISHED EMERGING COAL-FIRED POWER GENERATION TECHNOLOGIES DO NOT APPEAR TO OFFER THE DESIGN TECHNOLOGY BREAK-THROUGH N ...

    SBIR Phase I 1984 Environmental Protection Agency
  9. EVALUATION OF LOW CYCLE FATIGUE AND COATINGS WITH THE KET GAS PENETRANT INSPECTION PROCESS

    SBC: Qual-x, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  10. A LARGE PERCENTAGE OF THE ELECTRONIC INSTRUMENTS IN USE TODAY HAVE AN OSCILLATOR OR WAVEFORM GENERATOR OF SOME SORT.

    SBC: Sparta, Inc.            Topic: N/A

    A LARGE PERCENTAGE OF THE ELECTRONIC INSTRUMENTS IN USE TODAY HAVE AN OSCILLATOR OR WAVEFORM GENERATOR OF SOME SORT. AN OSCILLATOR MAY BE USED SIMPLY AS A SOURCE OR REGULARLY SPACED PULSES, A CLOCK, OR AS THE LOCAL OSCILLATOR IN A RECEIVER. NO MATTER HOW THE OSCILLATOR IS USED IT MUST MAINTAIN ITS FREQUENCY OF OSCILLATION TO A SPECIFIC DEGREE OF ACCURACY. IN A GROWING NUMBER OF APPLICATIONS THESE ...

    SBIR Phase I 1984 Department of DefenseNavy
US Flag An Official Website of the United States Government