You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
USE OF ROBOTICS IN AUTOMATIC FACTORY ASSEMBLY
SBC: ANALYTICAL BIOLOGICAL SERVICES, INC. Topic: N/AN/A
SBIR Phase I 1984 Department of DefenseNavy -
TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.
SBC: The Associated Corp Topic: N/ATAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...
SBIR Phase I 1984 Department of DefenseNavy -
THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS.
SBC: Autoflex, Inc. Topic: N/ATHE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS. THE FOCUS OF THE RESEARCH IS TO CONTROL THE ROBOT TOOL CONTROL POINT (TCP) THROUGH AN ADAPTIVE FEEDBACK CONTROL SYSTEM. THE ROLE OF THE FEEDBACK CONTROL SYSTEM IS TO CONTROL AND MODIFY THE PATH OF THE TCP TO WIT ...
SBIR Phase I 1984 Department of DefenseNavy -
THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO
SBC: Autoflex, Inc. Topic: N/ATHE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO FRAME RATES OF 30 FRAMES PER SECOND. THE SYSTEM CONFIGURATION UNDER INVESTIGATION WILL UTILIZE PARALLEL PROCESSING OF RAW VIDEO INPUT FROM MULTIPLE C ...
SBIR Phase I 1984 Department of DefenseNavy -
FEASIBILITY OF INSPECTING HIGH-Z CASTINGS USING X-RAY OR GAMMA-RAY TECHNIQUES
SBC: BIO-IMAGING RESEARCH, INC. Topic: N/AN/A
SBIR Phase I 1984 Department of DefenseNavy -
A NOVEL APPROACH TO RAM COATING
SBC: Damaskos, Inc. Topic: N/AN/A
SBIR Phase I 1984 Department of DefenseNavy -
PHOTOINTERCALATION SOLID ELECTROLYTE STORAGE CELL
SBC: ELTRON RESEARCH & DEVELOPMENT, INCORPORATED Topic: N/AN/A
SBIR Phase I 1984 Department of DefenseNavy -
RADAR TRAFFIC MONITOR FOR INTERSECTION TRAFFIC MANAGEMENT
SBC: Epsilon Lambda Electronics Corp. Topic: N/AROADWAY INTERSECTION TRAFFIC MANAGEMENT SYSTEMS ACCOMPLISH COMMAND AND CONTROL USING VEHICLE SENSORS WITH COMPUTERS WHICH HAVE SOPHISTICATED PROGRAMS (SOFTWEAR). COMPUTER TECHNOLOGY HAS PROGRESSED MORE RAPIDLY IN RECENT YEARS THAN SENSOR TECHNOLOGY. WIRE LOOPS WHICH ARE LAID IN THE PAVEMENT ARE COSTLY TO INSTALL AND MAINTAIN AND ARE NOT EASILY RECONFIGURED FOR AN UPGRADE OF TRAFFIC CONTROL. A RADA ...
SBIR Phase II 1984 Department of Transportation -
ANTI-REFLECTIVE WINDOW COATINGS
SBC: Evaporated Coatings, Inc. Topic: N/AN/A
SBIR Phase I 1984 Department of DefenseNavy -
DEPOSITION OF LOW DEFECT DENSITY OPTICAL COATINGS
SBC: Ii-vi Inc. Topic: N/AN/A
SBIR Phase I 1984 Department of DefenseNavy