You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. LASER GENERATED SURFACE ACOUSTIC WAVES FOR FLAW DETECTION IN TRANSPORTATION SYSTEMS.

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
  2. ABSORPTION CAPABILITY

    SBC: Artech Corp            Topic: N/A

    SENSITIVITY OF STELLAR GUIDANCE OPTICS IS LIMITED BY REFLECTION OF STRAY LIGHT INSIDE THE OPTICAL SYSTEM. IMPROVEMENT BY 50-100% OR MORE CAN BE OBTAINED WITH A BLACK COATING, DISCOVERED BY CHARLES FELDMAN AT JOHNS HOPKINS APPLIED PHYSICS LABROATORY, CONSISTING OF SUBMICROSCOPIC COLUMNS OF AMORPHOUS SILICON PRODUCED BY ETCHING THE SURFACE OF A SOLID SILICON LAYER. THE PROGRAM, WITH DR. FELDMAN AS C ...

    SBIR Phase I 1984 Department of DefenseNavy
  3. TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.

    SBC: The Associated Corp            Topic: N/A

    TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...

    SBIR Phase I 1984 Department of DefenseNavy
  4. THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS.

    SBC: Autoflex, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS. THE FOCUS OF THE RESEARCH IS TO CONTROL THE ROBOT TOOL CONTROL POINT (TCP) THROUGH AN ADAPTIVE FEEDBACK CONTROL SYSTEM. THE ROLE OF THE FEEDBACK CONTROL SYSTEM IS TO CONTROL AND MODIFY THE PATH OF THE TCP TO WIT ...

    SBIR Phase I 1984 Department of DefenseNavy
  5. THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO

    SBC: Autoflex, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO FRAME RATES OF 30 FRAMES PER SECOND. THE SYSTEM CONFIGURATION UNDER INVESTIGATION WILL UTILIZE PARALLEL PROCESSING OF RAW VIDEO INPUT FROM MULTIPLE C ...

    SBIR Phase I 1984 Department of DefenseNavy
  6. THE MARINE CORPS TRAINS ITS COMMANDERS AND THEIR STAFFS UNDER A NUMBER OF CONSTRAINTS (TIME, MONEY, TRAINING AREAS, ETC.

    SBC: Betac Corp            Topic: N/A

    THE MARINE CORPS TRAINS ITS COMMANDERS AND THEIR STAFFS UNDER A NUMBER OF CONSTRAINTS (TIME, MONEY, TRAINING AREAS, ETC.) NEW C3I SYSTEMS AND WEAPON SYSTEMS REQUIRE MORE TRAINING THAN EVER BEFORE. ONE INNOVATIVE TOOL THE MARINE CORPS HAS DEVELOPED IS THE TACTICAL WARFARE SIMULATION EVALUATION AND ANALYSIS SYSTEM (TWSEAS) IT IS, HOWEVER, BECOMING OBSOLETE AND ITS REPLACEMENT WILL REQUIRE CAREFUL AN ...

    SBIR Phase I 1984 Department of DefenseNavy
  7. NAVAL AIRCRAFT REFUELING ALTERNATIVES

    SBC: DCS CORP.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  8. ON-THE-BOTTOM SURVEILANCE BUOY

    SBC: Defense Systems Inc.            Topic: N/A

    A SONOBUOY ON THE BOTTOM OF THE OCEAN CAN ACHIEVE LONG DETECTION RANGES BY USE OF THE RELIABLE ACOUSTIC PATH (RAP). BY PUTTING AN ACOUSTIC SIGNAL PROCESSOR IN THE BUOY TO DO SPECTRUM ANALYSIS AND CONTACT REPORT GENERATION, THE DATA TRANSMITTED TO SURVEILLANCE AIRCRAFT CAN BE REDUCED TO SHORT BURSTS ON A SCHEDULE THAT MEETS PATROL AIRCRAFT REVISIT REQUIREMENTS FOR INCREASED AIRCRAFT UTILIZATION AT ...

    SBIR Phase II 1984 Department of DefenseNavy
  9. ADVANCED ASW WEAPONS TECHNOLOGY EVALUATION STRATEGY

    SBC: Defense Systems Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  10. LOW POWER HF SURFACE WAVE COMMUNICATIONS

    SBC: Defense Systems Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
US Flag An Official Website of the United States Government