List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.

    SBC: The Associated Corp            Topic: N/A

    TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...

    SBIR Phase I 1984 Department of DefenseNavy
  2. SEQUENTIAL DESIGNS FOR MINE WARFARE PLANNING

    SBC: The Associated Corp            Topic: N/A

    THE OBJECTIVE OF THIS PROPOSED RESEARCH IS TO DEVELOP NEW ANALYTIC METHODS FOR CHARACTERIZING MINE WARFARE EFFECTIVENESS. IT WILL USE A COMBINATION OF A PRIOR KNOWLEDGE OF SEQUENTIAL CHOICE OUTCOMES AND UNCERTAINTY IN SEQUENTIAL OUTCOMES. THE APPROACH WILL BE TO DEVELOP A SEQUENTIAL DESIGN ANALYSIS OF PERFORMANCE FOR INDIVIDUAL MINE FIELDS WHICH FULLY CHARACTERIZES SYSTEM PERFORMANCE LINKED TO OBJ ...

    SBIR Phase I 1987 Department of DefenseNavy
  3. THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS.

    SBC: Autoflex, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS. THE FOCUS OF THE RESEARCH IS TO CONTROL THE ROBOT TOOL CONTROL POINT (TCP) THROUGH AN ADAPTIVE FEEDBACK CONTROL SYSTEM. THE ROLE OF THE FEEDBACK CONTROL SYSTEM IS TO CONTROL AND MODIFY THE PATH OF THE TCP TO WIT ...

    SBIR Phase I 1984 Department of DefenseNavy
  4. THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO

    SBC: Autoflex, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO FRAME RATES OF 30 FRAMES PER SECOND. THE SYSTEM CONFIGURATION UNDER INVESTIGATION WILL UTILIZE PARALLEL PROCESSING OF RAW VIDEO INPUT FROM MULTIPLE C ...

    SBIR Phase I 1984 Department of DefenseNavy
  5. EXPLORATORY DEVELOPMENT OF SHIP MOTIONS EFFECTS ON ROBOT DYNAMICS AND EQUIPMENT LIFE

    SBC: Automated Analysis Corporation            Topic: N/A

    THE INTENTION IS TO INVESTIGATE THE SHIP MOTION EFFECTS ON ROBOT DYNAMICS AND EQUIPMENT LIFE. THE ON-BOARD ROBOT IS EQUIVALENT TO A STATIONARY ROBOT WITH BASE EXCITATION DUE TO SHIP MOTION. THE EXCITA-TION AT THE ROBOT BASE WILL BE MONITORED EITHER BY PLACING GYROSCOPES AND ACCELEROMETERS AT THAT POSITION, OR BY ASSUMING THE SHIP IS A RIGID BODY AND PLACING GYROSCOPES AND ACCELEROMETERS ON THE SHI ...

    SBIR Phase I 1987 Department of DefenseNavy
  6. FRACTURE TOUGHNESS CHARACTERIZATION OF FIBER-REINFORCED COMPOSITES

    SBC: Concept Analysis Corp            Topic: N/A

    CONCEPT ANALYSIS CORPORATION (CAC) PROPOSES TO DEVELOP A NEW ANALYTICAL APPROACH FOR THE FRACTURE CHARACTERIZATION OF FIBERREINFORCED COMPOSITES. THE BASIC PHYSICAL FAILURE MODES IN THE FORM OF; FIBER BREAKAGE, MATRIX CRACKS, FIBER-MATRIX INTERFACE DEBOND, FIBER PULLOUT, AND MATRIX YIELDING (WHICH ARE CHARACTERISTICS OF THESEHETEROGENEOUS MATERIALS) WILL BE TAKEN INTO ACCOUNT BY PERFORMING A MICRO ...

    SBIR Phase I 1987 Department of DefenseNavy
  7. RULE BASE EXPERT SYSTEM FOR RETAIL INVENTORY ITEM MANAGEMENT

    SBC: Dialog Systems Inc.            Topic: N/A

    THE FEASIBILITY OF THE PROPOSED EXPERT SYSTEM WILL BE PROVEN THROUGH ACHIEVEMENT OF THREE GOALS IN PHASE I. THESE GOALS ARE: 1) DEVELOPMENT OF A CONCEPTUAL DESIGN, 2) DEFINITION OF COST/BENEFITS, AND 3) DEVELOPMENT AND EVALUATION OF A PROTOTYPE EXPERT SYSTEM ON A PERSONAL COMPUTER. THE OUTPUTS OF PHASE I WILL BE A WRITTEN REPORT AND A WORKING COPY OF THE PROTOTYPE. THE PROPOSED EXPERT SYSTEM WOULD ...

    SBIR Phase II 1987 Department of DefenseNavy
  8. ADVANCED DIGITAL FRINGE ANALYSIS WORKSTATION

    SBC: Kms Fusion Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseNavy
  9. DEVELOPMENT OF A RUGGEDIZED LOW COST MICROCOMPUTER

    SBC: Kms Fusion Inc            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  10. FREON ABSORPTION AIR CONDITIONING

    SBC: Phillips Engineering Co            Topic: N/A

    THE PURPOSE OF THIS PROJECT IS TO INVESTIGATE THE APPLICABILITY TO NAVAL SHIPS OF RECENT DEVELOPMENTS IN ABSORPTION AIR CONDITIONING USING FLUOROCARBON REFRIGERANTS AND ORGANIC ABSORBENTS AS THE WORKING FLUIDS. THE INVESTIGATION WILL REVIEW THE WORK IN THE FLUOROCARBON ABSORPTION FIELD DURING THE LAST 20 YEARS WORLD WIDE. THE MANY COMBINATIONS OF FLUOROCARBON REFRIGERANTS AND ORGANIC ABSORBENTS AR ...

    SBIR Phase I 1987 Department of DefenseNavy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government