You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low Cost, High Performance GPS/IMU Attitude and Orientation System

    SBC: Applied Analytics, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseNavy
  2. SIMULTANEOUS ENGINEERING AUTOMATION

    SBC: Aquidneck Management Associate            Topic: N/A

    A NEW GENERATION OF ENGINEERING AND MANUFACTURING AUTOMATION DESIGNTOOLS ARE NOW EMERGING AS A RESULT OF THE PIONEERING WORK THAT HAS BEEN DONE IN OBJECTORIENTED PROGRAMMING TECHNOLOGY. UNLIKE CONVENTIONAL PROCEDURAL LANGUAGE APPROACHES, THE OBJECT-ORIENTED PROGRAMMING APPROACH ALLOWS DATA STRUCTURES AND PROCEDURES TO BE DEFINED FOR GENERIC CLASSES OF OBJECTS. SYSTEM PERFORMANCE, RNA, AND COST DAT ...

    SBIR Phase I 1991 Department of DefenseNavy
  3. TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.

    SBC: The Associated Corp            Topic: N/A

    TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...

    SBIR Phase I 1984 Department of DefenseNavy
  4. THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS.

    SBC: Autoflex, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS. THE FOCUS OF THE RESEARCH IS TO CONTROL THE ROBOT TOOL CONTROL POINT (TCP) THROUGH AN ADAPTIVE FEEDBACK CONTROL SYSTEM. THE ROLE OF THE FEEDBACK CONTROL SYSTEM IS TO CONTROL AND MODIFY THE PATH OF THE TCP TO WIT ...

    SBIR Phase I 1984 Department of DefenseNavy
  5. THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO

    SBC: Autoflex, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO FRAME RATES OF 30 FRAMES PER SECOND. THE SYSTEM CONFIGURATION UNDER INVESTIGATION WILL UTILIZE PARALLEL PROCESSING OF RAW VIDEO INPUT FROM MULTIPLE C ...

    SBIR Phase I 1984 Department of DefenseNavy
  6. SUBMARINE COMBAT SYSTEM OPERATOR TRAINING WORKSTATION CONCEPTS

    SBC: Business And Engineering Tech            Topic: N/A

    THIS TASK WILL IDENTIFY THE ISSUES CONCERNING COMBAT SYSTEM TRAINING REQUIREMENTS. IN ADDITION TO FUNCTIONAL NEEDS, THE ISSUES OF EASE OF SYSTEM UPGRADES AND RAPID PROTOTYPING WILL BE ADDRESSED. INITIAL INPUT DATA WILL BE OBTAINED FROM NAVAL TRAINING PLANS, AND EXISTING TRAINING DEVICE CAPABILITIES. THIS WILL IDENTIFY THE LEVELS OF REQUIRED TRAINING AND THE SKILLS THAT MUST BE TAUGHT. A WORKSTATIO ...

    SBIR Phase I 1991 Department of DefenseNavy
  7. Multispectral Imaging Comparative Design Study

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    Conventional imaging spectrometers acquire data within a four dimensional continuum (x,y,l,t) in several ways, all of which involve some form of scanning--mirrors must be moved or different filters must be dialed in. We are proposing to compare the relative costs and benefits of three different approaches to obtaining multispectral imaging data. The three proposed approaches represent a broad cros ...

    SBIR Phase I 1995 Department of DefenseNavy
  8. LARGE AREA FAST SPECTRORADIOMETER

    SBC: Daedalus Enterprises, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseNavy
  9. SUBMARINE COMBAT SYSTEM ARCHITECTURE WITH WORKSTATIONS

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    CURRENT SUBMARINE COMBAT SYSTEM ARCHITECTURES REFLECT A WEAK LINKAGE FROM OPERATIONAL REQUIREMENTS TO IMPLEMENTATION. ARCHITECTURES RANGE FROM THOSE WITH LARGE CENTRAL COMPUTERS TO THOSE WITH CLUSTERED DISTRIBUTED PROCESSORS. SINGLE POINTS OF FAILURE, DATA BOTTLENECKS, AND PROCESSOR CONFLICTS RESULT FROM ARCHITECTURES THAT DO NOT HAVE OPERATIONAL REQUIREMENTS AS THEIR BASIS. THE EFFORT PROPOSED US ...

    SBIR Phase I 1991 Department of DefenseNavy
  10. COMBINED MODELS FOR COMBAT SYSTEM ASSESSMENT

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    TACTICAL PERFORMANCE, RELIABILITY, AND COST ARE COMPLIMENTARY FACTORS IN SYSTEM DESIGN BUT THERE IS NO ONE TOOL TO EFFECTIVELY COMPARE ATTRIBUTES IN THESE DISPARATE DISCIPLINES. THERE ARE COMPUTER PROGRAMS TO ESTIMATE SYSTEM PERFORMANCE AGAINST THE THREAT, COMPUTER MODELS TO PREDICT RELIABILITY IN A GIVEN ENVIRONMENT, AND COST MODELS TO ESTIMATE BOTH ACQUISITION AND OPERATIONS OVER TH6 LIFE OF A S ...

    SBIR Phase I 1991 Department of DefenseNavy
US Flag An Official Website of the United States Government