You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Naval Device Applications of Relaxor Piezoelectric Single Crystals

    SBC: Btech Acoustics, LLC            Topic: N02066

    This project is the development of a single crystal underwater acoustic modem transducer for Unmanned Underwater Vehicles (UUV) which is compact in size, operates at low to moderately low center frequencies, in a broad band frequency range to accommodate state-of-the-art binary, FSK and spread spectrum signaling schemes that promote covertness. The device exploits the high coupling coefficient an ...

    SBIR Phase II 2005 Department of DefenseNavy
  2. UAV based Network-Centric Communications for Sensors

    SBC: RELIABLE SYSTEM SERVICES CORP.            Topic: N04078

    Reliable System Services Corporation (RSS Corp.) proposes an 18-month program, with a 6-month option, to analyze, design, develop and demonstrate the feasibility of a low cost, low power, high capacity, robust RF communications network using UAV relays in an ocean environment. The developed architecture and design will be suitable for the Navy tactical environment and consistent with FORCEnet. A s ...

    SBIR Phase II 2005 Department of DefenseNavy
  3. Renewal/Service Life Extension of Weapon (Machine Gun) Components

    SBC: UCT DEFENSE, LLC            Topic: SOCOM03009

    The objective of this Phase II investigation is to optimize the coating process to apply a Nickel Boron coating on small barrel bores and develop pre-production prototypes of MK46 5.56mm Machine Gun Barrels using Ni-B coatings. The innovation proposes to address the shortcomings of the current Electroplated Hard Chrome bore coating, and is an advancement in surface finishing technology that provi ...

    SBIR Phase II 2005 Department of DefenseSpecial Operations Command
  4. Strategic applications of design and planning software to key shipbuilding areas, including surface preparation and coating

    SBC: INDUSTRIAL PLANNING TECHNOLOGY, INC.            Topic: N04142

    This project evaluated the feasibility of developing software to address the following problems: (1) analysis, simulation, design and planning of insulation, surface preparation, and coating of ships, and (2) integration of automatic planning and design tools with the popular Ship Constructor CAD package. Tools to support estimating and planning of shipboard surface preparation and coating have ...

    SBIR Phase II 2005 Department of DefenseNavy
  5. Aircraft Carrier Environmental Maintenance Enclosure

    SBC: STEALTH INDUSTRIES US LLC            Topic: N02135

    The project is a movable self supporting interior environmental enclosure for securing to specific areas on a flight deck of an aircraft carrier is most any weather conditions an providing an interior environment suitable for non-skid coating removal and application within the range of the required specifications.

    SBIR Phase II 2005 Department of DefenseNavy
  6. Vertical Flight Deck Operations Trainer

    SBC: CARMEL APPLIED TECHNOLOGIES, INC.            Topic: N02080

    As noted in a Congressional Budget Cost Report in 1999, each flight hour for an H-60 helicopter costs approximately $12,000 per hour of flight. A properly-designed training device for LSE Students could supplement or replace live helicopter flight hours, and has the potential to provide LSE’s that are better trained to handle Emergency Conditions as well saving a great deal of money. This Phas ...

    SBIR Phase II 2005 Department of DefenseNavy
  7. The Protection of Radio Networks Using Physics-Based Authentication and Location Awareness

    SBC: DIGITAL AUTHENTICATION TECHNOLOGIES, INC.            Topic: N04024

    Digital Authentication Technologies, Inc. (“DAT”) proposes to begin design, build, debug and testing of its innovative physics-based system that has been developed in its NAVAIR Phase I contract. As the Phase I work describes, the DAT system introduces physics-based strong authentication and location awareness to defeat hacker tools and add additional layers of protection to currently exposed ...

    SBIR Phase II 2005 Department of DefenseNavy
  8. Multi-Source Vertical Obstruction Generation

    SBC: SIMWRIGHT, INC.            Topic: N04015

    The objective of this Phase II SBIR development effort is to automate the process for extracting obstruction clearance features. These processes developed here will have direct applicability to other automated geospatial feature extraction problems. This development will include combining computer vision based algorithms and photogrammetric techniques to automatically extract vertical obstruction ...

    SBIR Phase II 2005 Department of DefenseNavy
  9. Submarine Emulsified and Mixed Hydraulic Oil Cleaning, Filtration and Reuse Aboard Ship

    SBC: NELSON ENGINEERING CO.            Topic: N03073

    Hydraulic and lubricating fluids provide critical functionality for Los Angeles Class Attack Submarines. Submarine hydraulic systems continuously experience salt water intrusion that results in contamination of hydraulic fluid and leads to component failures. Our objective is to develop a commercially-viable, lightweight Portable Filtration Unit (PFU) capable of restoring hydraulic fluid to better ...

    SBIR Phase II 2005 Department of DefenseNavy
  10. Image Intensified Lightweight Lens Development

    SBC: GRAFLEX, INC.            Topic: SOCOM04009

    Design,develop, fabricate and test sample a series of Image Intensifierd lightweight lenses, fixed focal length and stepped zoom, for direct viewing and Low Light Level TV video applications, Fixed Focal Length ratings of 225mm f1.7 and 360mm f2.7 along with a 80mm f1.7/225mm f1.7/360mm f2.7 stepped zoom to be provided. Provide suitable image intensified test bed equipments for comparative evalua ...

    SBIR Phase II 2005 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government