You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.
SBC: The Associated Corp Topic: N/ATAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...
SBIR Phase I 1984 Department of DefenseNavy -
IMPROVED PERFORMANCE OF TONPILZ-TYPE TRANSDUCER ELEMENTS CAN RESULT FROM (1) INCREASING THE AREA OF THE RADIATING FACE AND (2) DECREASING THE MASS OF THE RADIATING HEAD.
SBC: B-k Dynamics Inc Topic: N/AIMPROVED PERFORMANCE OF TONPILZ-TYPE TRANSDUCER ELEMENTS CAN RESULT FROM (1) INCREASING THE AREA OF THE RADIATING FACE AND (2) DECREASING THE MASS OF THE RADIATING HEAD. HOWEVER, SUCH IMPROVEMENT IS LIMITED BY THE INTRODUCTION OF A FLEXURE MODE, WITH THE OUTER RING MOVING AT A DIFFERENT VELOCITY AND PHASE FROM THE INNER AREA OF THE HEAD-MASS. THE UNDESIRABLE RESULT IS A BI-MODAL RESPONSE WITH, GEN ...
SBIR Phase I 1984 Department of DefenseNavy -
PROPOSAL TO DEVELOP A SHIP PROPELLER TIP VORTEX ANALYSIS
SBC: SCIENTIFIC RESEARCH ASSOC., INC. Topic: N/AA PROPOSAL IS PRESENTED HEREIN TO DEVELOP A NUMERICAL PROCEDURE FOR ANALYZING THE SHIP NUMERICAL PROCEDURE FOR ANALYZING THE SHIP PROPELLER TIP VORTEX PROBLEM. THE FLOW IN THIS REGION IS VERY COMPLEX AS IT CONTAINS THREE-DIMENSIONAL, VISCOUS AND CENTRIFUGAL EFFECTS. THE LONG TERMS GOAL OF THE PROPOSED EFFORT WOULD DEVELOP A COMPREHENSIVE PREDICTIVE PROCEDURE FOR THE SHIP PROPELLER TIP REGION WITH ...
SBIR Phase II 1984 Department of DefenseNavy -
ELASTOMERS
SBC: Springborn Materials Science Topic: N/AMETHYLENE BIS O-CHLORO ANILINE HAS LONG BEEN RECOGNIZED AS A SUPERIOR URETHANE CURATIVE BUT TOXICITY CONCERNS HAVE LIMITED ITS USE. ALTERNATIVE COMPOUNDS ARE AVAILABLE, BUT THEY CANNOT MATCH THE HANDLING AND ULTIMATE PHYSICAL PROPERTIES OF MOCA CURED ELASTOMERS. AN INVESTIGATIONS OF NOVEL PLYAMINE AND POLYOL COMPOUNDS SHOULD YIELD NEW AND USEFUL URETHANE CURATIVES. THE PROGRAM WOULD IN VOLVE SCREE ...
SBIR Phase I 1984 Department of DefenseNavy -
FLAME RETARDANT FLEXIBLE POLYURETHANE FOAM FINDS WIDESPREAD COMMERCIAL USE AS A SEATING MATERIAL DUE TO ITS FAVORABLE COST, SUPPORT, AND RESILIENCE CHARACTERISTICS.
SBC: Springborn Materials Science Topic: N/AFLAME RETARDANT FLEXIBLE POLYURETHANE FOAM FINDS WIDESPREAD COMMERCIAL USE AS A SEATING MATERIAL DUE TO ITS FAVORABLE COST, SUPPORT, AND RESILIENCE CHARACTERISTICS. HOWEVER, SMOKE AND TOXIC GAS EVOLUTION IN THE EVENT OF FIRE IS A MAJOR PROBLEM. THE GOAL OF THIS PROGRAM IS TO CREATE A FIRE RESISTANT COMPOSITE FOAM STRUCTURE WHICH WILL GENERATE NEGLIGIBLE QUANTITIES OF TOXIC FUMES WHEN EXPOSED TO FI ...
SBIR Phase I 1984 Department of Transportation -
CLOUDS OVER AMPHIBIOUS OPERATIONS
SBC: Trc Environmental Consultants Topic: N/ATHIS PROPOSED STUDY WILL EXAMINE THE FEASIBILITY OF USING A EULERIAN LIMITED AREA MODEL (LAM) TO IMPROVE PREDICTION OF CHEMICAL, BIOLOGICAL, AND OBSCURANT CLOUDS DURING AMPHIBIOUS OPERATIONS. THE LAM HAS BEEN USED TO PREDICT MESOSCALE AND MICROSCALE METEORO LOGICAL PHENOMENA FOR A WIDE VARIETY OF CLIMATIC REGIMES AND HAS BEEN TESTED FOR A NUMBER OF EXTENSIVE METEOROLOGICAL FIELD EXPERIMENTS. THE L ...
SBIR Phase I 1984 Department of DefenseNavy -
(CIG)
SBC: W W Gaertner Research Inc. Topic: N/ALOW-COST CIG SIMULATORS FOR WEAPONS TRAINING COULD BE PRODUCED THROUGH THE USE OF VLSI CHIPS SPECIFICALLY DESIGNED TO CARRY OUT THE MAJOR FUNCTIONS OF IMAGE GENERATION, NAMELY 3-D PERSPECTIVE, DIFFUSE REFLECTION AND SHADING, HIDDEN SURFACE REMOVAL AND OCCULTATION IN GENERAL, CLIPPING AND AREA FILL. THESE CHIPS WILL BE FAST ENOUGH TO ALLOW COMPUTATION AT 60 FRAMES/SEC WITH A RESOLUTION OF 1024 X 10 ...
SBIR Phase I 1984 Department of DefenseNavy -
Bonded Joint Analysis Method
SBC: Global Engineering and Materials, Inc. Topic: N12AT004A combined discrete cohesive interface fracture and continuum damage mechanics initiation and propagation toolkit for Abaqus will be developed for the residual strength prediction of adhesively bonded composite structures subjected to multi-axial loading. This tool will allow us, for the first time, to be able to simulate concurrently both the continuum and discrete damage progression at the bonde ...
STTR Phase I 2012 Department of DefenseNavy -
Total Fatigue Life Assessment of Complicated Structures
SBC: Global Engineering and Materials, Inc. Topic: N12AT006Global Engineering and Materials, Inc. (GEM) along with its team members Northwestern University, Lockheed Martin, and Boeing Company, propose to develop an automatic software tool for 2D/3D fatigue crack growth prognosis of complicated structures under multi-axial loading. The XFAT toolkit will be developed by integrating a unified crack initiation and propagation model with an enhanced mesh inde ...
STTR Phase I 2012 Department of DefenseNavy -
Submarine ES System RF Groom&Certification
SBC: SEACORP, LLC Topic: N08T015US Navy submarine forces currently employ an independent team to test, measure, calibrate and certify radio frequency (RF) signal paths through sail mounted antennae to the inboard radio rooms in a process that can take in excess of 60 man-days to complete. Ships personnel have no means of calibrating or performing an operational verification of the ES suite once underway. Ships have no means of p ...
STTR Phase II 2012 Department of DefenseNavy