You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Ultra Wide Bandwidth High Dynamic Range Digital ISR Receivers for the submarine force
SBC: SEACORP, LLC Topic: N101059This effort to improve the capabilities of the ESM system will increase the reliability and reduce lifecycle support costs of the Radar Wideband (RWB) subsystem on submarines. Analog to digital converter (A/D) based digital receivers will be applied to yield improvements in Radar signal acquisition and processing. In-phase and Quadrature (I/Q) data streams will be created from which intra pulse mo ...
SBIR Phase II 2012 Department of DefenseNavy -
Echo Time Distance Measurements for Nanosatellite Arrays
SBC: American Academy of Aeronautics Topic: S401This proposal presents a technique for the precise determination of distance between nodes of a planar array of nanosatellites for synthetic aperture and sensor array applications. The proposed effort will result in a navigational technique that can precisely determine the positions of nanosatellite sensor nodes in the array. The proposed innovation enables higher performance and low cost sensor a ...
SBIR Phase I 2012 National Aeronautics and Space Administration -
OpenCL-Based Linear Algebra Libraries for High-Performance Computing
SBC: EM PHOTONICS INC Topic: S601Despite its promise, OpenCL adoption is slow, owing to a lack of libraries and tools. Vendors have shown few signs of plans to provide OpenCL libraries, and were they to do so they would likely be incompatible with one another, much as NVIDIA's BLAS (CUDA) is presently not interchangeable with Intel's BLAS (MKL). The unified language and environment of OpenCL allows the community to ensu ...
SBIR Phase I 2012 National Aeronautics and Space Administration -
Carbon Nanotube (CNT) and Carbon Fiber Reinforced SiC Optical Components
SBC: M CUBED TECHNOLOGIES, INC. Topic: S204M Cubed has developed and patented technology to make carbon fiber reinforced SiC composites and components. In addition, the feasibility of doubling the toughness of SiC with carbon nanotube (CNT) reinforcement has been proven. In this program, M Cubed will demonstrate further innovative modifications of the above technology to make extremely lightweight, high toughness, low CTE optical component ...
SBIR Phase I 2012 National Aeronautics and Space Administration -
Advanced Long-Range Video Capabilities Using Speckle Imaging Techniques
SBC: EM PHOTONICS INC Topic: A402Flight-testing is a crucial component in NASA's mission to research and develop of new aeronautical concepts, allowing for verification of simulated and wind-tunnel results, and exposing previously unforeseen design problems. Video is an invaluable tool for flight-testing, allowing the collection of a wealth of information; however, collected long-range imagery typically suffers from scintill ...
SBIR Phase I 2012 National Aeronautics and Space Administration -
ISS Additive Manufacturing Facility for On-Demand Fabrication in Space
SBC: Made In Space, Inc. Topic: O302The ability to manufacture on the International Space Station will enable on-demand repair and production capability, as well as essential research for manufacturing on long-term missions.Having an Additive Manufacturing Facility (AMF) on the ISS will allow for immediate repair of essential components, upgrades of existing hardware, installation of new hardware that is manufactured, and the manufa ...
SBIR Phase I 2012 National Aeronautics and Space Administration -
TECHNOLOGY FOR PRESSURE-INSTRUMENTED THIN AIRFOIL MODELS
SBC: Applied Cryogenics & Materials Topic: N/APRESSURE INSTRUMENTED AIRFOIL MODELS FOR TESTING IN CRYOGENIC WIND TUNNELS DEMAND THE SIMULTANEOUS ACHIEVEMENT OF MANY FACTORS INCLUDING STRENGTH, TOUGHNESS, DIMENSIONAL STABILITY, MACHINABILITY, BONDABILITY, ACCURACY OF PROFILE AND SURFACE FINISH. MANY PREVIOUS MODELS HAVE FAILED TO REACH COMPLETION OR HAVE PERFORMED INADEQUATELY BECAUSE ACHIEVEMENT OF SOME FACTORS HAS CRITICALLY COMPROMISED OTHE ...
SBIR Phase II 1984 National Aeronautics and Space Administration -
TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.
SBC: The Associated Corp Topic: N/ATAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...
SBIR Phase I 1984 Department of DefenseNavy -
ICING MONITORING EQUIPMENT
SBC: JONAS, INC. Topic: N/AN/A
SBIR Phase I 1984 Department of Transportation -
Submarine ES System RF Groom&Certification
SBC: SEACORP, LLC Topic: N08T015US Navy submarine forces currently employ an independent team to test, measure, calibrate and certify radio frequency (RF) signal paths through sail mounted antennae to the inboard radio rooms in a process that can take in excess of 60 man-days to complete. Ships personnel have no means of calibrating or performing an operational verification of the ES suite once underway. Ships have no means of p ...
STTR Phase II 2012 Department of DefenseNavy