You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Ultra Wide Bandwidth High Dynamic Range Digital ISR Receivers for the submarine force

    SBC: SEACORP, LLC            Topic: N101059

    This effort to improve the capabilities of the ESM system will increase the reliability and reduce lifecycle support costs of the Radar Wideband (RWB) subsystem on submarines. Analog to digital converter (A/D) based digital receivers will be applied to yield improvements in Radar signal acquisition and processing. In-phase and Quadrature (I/Q) data streams will be created from which intra pulse mo ...

    SBIR Phase II 2012 Department of DefenseNavy
  2. ACTIVATED METAL DECOY FOR LOW IR SIGNATURE AIRCRAFT

    SBC: Alloy Surfaces Company, Inc.            Topic: N/A

    ACTIVATED STEEL FOIL FABRICATED INTO ELEMENTS TO BE PACKAGED AS EXPENDABLE DECOYS HAS SHOWN GOOD PERFORMANCE IN LOW IR SIGNATURE APPLICATIONS. THE PRESENT BATCH PRODUCTION PROCESS FOR THESE FOILS ENTAILS, IN PART, TWENTY HOURS OF FURNACE TREATMENT. A COMBINATION OF NINE SEPARATE OPERATIONS, LOW PRODUCTION RATES AND HIGH LABOR COSTS YIELDS A UNIT MANUFACTURING COST OF MORE THAN $250.00. WE PROPOSE ...

    SBIR Phase I 1990 Department of DefenseNavy
  3. TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.

    SBC: The Associated Corp            Topic: N/A

    TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...

    SBIR Phase I 1984 Department of DefenseNavy
  4. STANDARDIZED INTERACTIVE ELECTRONIC PRESENTATION OF WEAPON SYSTEM TROUBLESHOOTING

    SBC: Hyper-view Systems Corp            Topic: N/A

    THIS PROPOSAL IDENTIFIES A STRATEGY, BASED ON NEW OFF-THE-SHELF TOOLS, PROTOTYPING, AND INTERACTION WITH MAINTENANCE PERSONNEL, FOR DEVELOPING INFORMATION PRESENTATION GUIDELINES WHICH SUPPORT MAINTENANCE PERSONNEL WITH VARIOUS EXPERIENCE LEVELS, THE ENVIRONMENTS IN WHICH THE MAINTENANCE IS PERFORMED, THE DIFFERENT MEDIA AVAILABLE FOR ONLINE INFORMATION DISPLAY, AND THE COST-EFFECTIVE OF IMPLEMENT ...

    SBIR Phase I 1990 Department of DefenseNavy
  5. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
  6. MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    KVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...

    SBIR Phase I 1990 Department of Transportation
  7. Submarine ES System RF Groom&Certification

    SBC: SEACORP, LLC            Topic: N08T015

    US Navy submarine forces currently employ an independent team to test, measure, calibrate and certify radio frequency (RF) signal paths through sail mounted antennae to the inboard radio rooms in a process that can take in excess of 60 man-days to complete. Ships personnel have no means of calibrating or performing an operational verification of the ES suite once underway. Ships have no means of p ...

    STTR Phase II 2012 Department of DefenseNavy
  8. Battery Management, Monitoring and Diagnostic Device for Navy Energy Storage Modules

    SBC: Yardney Technical Products, Inc.            Topic: N113177

    Yardney Technical Products in conjunction with Johns Hopkins University Applied Physics Laboratory is proposing to progress development of an advanced monitoring system for batteries, provide a modular battery unit, and develop a system approach to monitor and control multiple power sources and loads. Battery monitoring will be advanced via a technique to determine the internal temperature of each ...

    SBIR Phase I 2012 Department of DefenseNavy
  9. High Energy Density Chemistry Source for Temporary Torpedo Electrical Power

    SBC: Yardney Technical Products, Inc.            Topic: N121067

    Yardney Technical Products, Inc., with SBIR partners, Brown University and Fraunhofer LLC, propose to develop a high energy density, high power, bipolar battery. Bipolar battery designs are inherently the most volumetrically efficient batteries. Further, the elimination of the external intercell connections greatly improves the rate capability and solves the issue of making a very low capacity, hi ...

    SBIR Phase I 2012 Department of DefenseNavy
  10. Imaging Instrumentation System

    SBC: DBV TECHNOLOGY, LLC            Topic: N08199

    DBV Technology, LLC proposes to design, build, integrate and test an array of undersea acoustic instruments capable of scoring multiple projectiles impacting the ocean surface closely spaced in both position and time using algorithms developed during Phase I. A 48 month period of performance is proposed consisting of one 12 month base period, with three subsequent 12 month options. Instrument oper ...

    SBIR Phase II 2012 Department of DefenseNavy
US Flag An Official Website of the United States Government