You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Ultra Wide Bandwidth High Dynamic Range Digital ISR Receivers for the submarine force

    SBC: SEACORP, LLC            Topic: N101059

    This effort to improve the capabilities of the ESM system will increase the reliability and reduce lifecycle support costs of the Radar Wideband (RWB) subsystem on submarines. Analog to digital converter (A/D) based digital receivers will be applied to yield improvements in Radar signal acquisition and processing. In-phase and Quadrature (I/Q) data streams will be created from which intra pulse mo ...

    SBIR Phase II 2012 Department of DefenseNavy
  2. TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.

    SBC: The Associated Corp            Topic: N/A

    TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...

    SBIR Phase I 1984 Department of DefenseNavy
  3. AUTOMATIC CALIBRATION ELECTROMAGNETIC FLUXGATE AIRCRAFT SENSOR SYSTEM

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseNavy
  4. OCEAN WAVE ENERGY CONVERTER

    SBC: Ocean Wave Energy Co            Topic: N/A

    MAJOR AIDS TO NAVIGATION (ATON) ARE ESSENTIAL SIGNPOSTS FOR SAFE PASSAGE ALONG COASTAL AND OFFSHORE SEAWAYS. PRESENTLY, THEIR SIGNALS ARE POWERED BY ON-SITE ENGINE GENERATORS REQUIRING CONSIDERABLE AND COSTLY MAINTENANCE. ATON AUTONOMY WILL BE GREATLY INCREASED WITH DEEP DISCHARGE BATTERY TECHNOLOGY PROVIDING THAT ON-SITE CHARGING SOURCES ARE USED. AMONG NATURALLY AVAILABLE SOURCES, THE UNCEASING ...

    SBIR Phase I 1989 Department of Transportation
  5. Submarine ES System RF Groom&Certification

    SBC: SEACORP, LLC            Topic: N08T015

    US Navy submarine forces currently employ an independent team to test, measure, calibrate and certify radio frequency (RF) signal paths through sail mounted antennae to the inboard radio rooms in a process that can take in excess of 60 man-days to complete. Ships personnel have no means of calibrating or performing an operational verification of the ES suite once underway. Ships have no means of p ...

    STTR Phase II 2012 Department of DefenseNavy
  6. Low Dark Current, Extended Wavelength SWIR Sensors Using Hydrogenated nBn InGaAs

    SBC: AMETHYST RESEARCH INC            Topic: SOCOM12002

    Improved performance SWIR sensors with extended wavelength response to 2.5 microns will be developed using two disruptive technologies with which Amethyst has demonstrated success: nBn detector structures and defect passivation via hydrogenation. Similar to conventional extended wavelength photodiodes, the improved sensors will based on mismatched InGaAs grown on graded buffer layers on InP substr ...

    SBIR Phase I 2012 Department of DefenseSpecial Operations Command
  7. Battery Management, Monitoring and Diagnostic Device for Navy Energy Storage Modules

    SBC: Yardney Technical Products, Inc.            Topic: N113177

    Yardney Technical Products in conjunction with Johns Hopkins University Applied Physics Laboratory is proposing to progress development of an advanced monitoring system for batteries, provide a modular battery unit, and develop a system approach to monitor and control multiple power sources and loads. Battery monitoring will be advanced via a technique to determine the internal temperature of each ...

    SBIR Phase I 2012 Department of DefenseNavy
  8. High Energy Density Chemistry Source for Temporary Torpedo Electrical Power

    SBC: Yardney Technical Products, Inc.            Topic: N121067

    Yardney Technical Products, Inc., with SBIR partners, Brown University and Fraunhofer LLC, propose to develop a high energy density, high power, bipolar battery. Bipolar battery designs are inherently the most volumetrically efficient batteries. Further, the elimination of the external intercell connections greatly improves the rate capability and solves the issue of making a very low capacity, hi ...

    SBIR Phase I 2012 Department of DefenseNavy
  9. Terahertz Nondestructive Evaluation and Characterization of Missile Radomes

    SBC: Wavetech, LLC            Topic: N121073

    We propose to demonstrate the feasibility of using time domain terahertz measurements to locate, identify and image defects and material variations within advanced composite materials used in missile radomes. We will investigate the time and frequency domain transmission properties of radome materials to determine their intrinsic terahertz electrical properties and prove the detectability of defec ...

    SBIR Phase I 2012 Department of DefenseNavy
  10. Imaging Instrumentation System

    SBC: DBV TECHNOLOGY, LLC            Topic: N08199

    DBV Technology, LLC proposes to design, build, integrate and test an array of undersea acoustic instruments capable of scoring multiple projectiles impacting the ocean surface closely spaced in both position and time using algorithms developed during Phase I. A 48 month period of performance is proposed consisting of one 12 month base period, with three subsequent 12 month options. Instrument oper ...

    SBIR Phase II 2012 Department of DefenseNavy
US Flag An Official Website of the United States Government