You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Ultra Wide Bandwidth High Dynamic Range Digital ISR Receivers for the submarine force
SBC: SEACORP, LLC Topic: N101059This effort to improve the capabilities of the ESM system will increase the reliability and reduce lifecycle support costs of the Radar Wideband (RWB) subsystem on submarines. Analog to digital converter (A/D) based digital receivers will be applied to yield improvements in Radar signal acquisition and processing. In-phase and Quadrature (I/Q) data streams will be created from which intra pulse mo ...
SBIR Phase II 2012 Department of DefenseNavy -
SIMULTANEOUS ENGINEERING AUTOMATION
SBC: Aquidneck Management Associate Topic: N/AA NEW GENERATION OF ENGINEERING AND MANUFACTURING AUTOMATION DESIGNTOOLS ARE NOW EMERGING AS A RESULT OF THE PIONEERING WORK THAT HAS BEEN DONE IN OBJECTORIENTED PROGRAMMING TECHNOLOGY. UNLIKE CONVENTIONAL PROCEDURAL LANGUAGE APPROACHES, THE OBJECT-ORIENTED PROGRAMMING APPROACH ALLOWS DATA STRUCTURES AND PROCEDURES TO BE DEFINED FOR GENERIC CLASSES OF OBJECTS. SYSTEM PERFORMANCE, RNA, AND COST DAT ...
SBIR Phase I 1991 Department of DefenseNavy -
TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.
SBC: The Associated Corp Topic: N/ATAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...
SBIR Phase I 1984 Department of DefenseNavy -
SUBMARINE COMBAT SYSTEM OPERATOR TRAINING WORKSTATION CONCEPTS
SBC: Business And Engineering Tech Topic: N/ATHIS TASK WILL IDENTIFY THE ISSUES CONCERNING COMBAT SYSTEM TRAINING REQUIREMENTS. IN ADDITION TO FUNCTIONAL NEEDS, THE ISSUES OF EASE OF SYSTEM UPGRADES AND RAPID PROTOTYPING WILL BE ADDRESSED. INITIAL INPUT DATA WILL BE OBTAINED FROM NAVAL TRAINING PLANS, AND EXISTING TRAINING DEVICE CAPABILITIES. THIS WILL IDENTIFY THE LEVELS OF REQUIRED TRAINING AND THE SKILLS THAT MUST BE TAUGHT. A WORKSTATIO ...
SBIR Phase I 1991 Department of DefenseNavy -
SUBMARINE COMBAT SYSTEM ARCHITECTURE WITH WORKSTATIONS
SBC: DEEGAN RESEARCH GROUP, INC. Topic: N/ACURRENT SUBMARINE COMBAT SYSTEM ARCHITECTURES REFLECT A WEAK LINKAGE FROM OPERATIONAL REQUIREMENTS TO IMPLEMENTATION. ARCHITECTURES RANGE FROM THOSE WITH LARGE CENTRAL COMPUTERS TO THOSE WITH CLUSTERED DISTRIBUTED PROCESSORS. SINGLE POINTS OF FAILURE, DATA BOTTLENECKS, AND PROCESSOR CONFLICTS RESULT FROM ARCHITECTURES THAT DO NOT HAVE OPERATIONAL REQUIREMENTS AS THEIR BASIS. THE EFFORT PROPOSED US ...
SBIR Phase I 1991 Department of DefenseNavy -
COMBINED MODELS FOR COMBAT SYSTEM ASSESSMENT
SBC: DEEGAN RESEARCH GROUP, INC. Topic: N/ATACTICAL PERFORMANCE, RELIABILITY, AND COST ARE COMPLIMENTARY FACTORS IN SYSTEM DESIGN BUT THERE IS NO ONE TOOL TO EFFECTIVELY COMPARE ATTRIBUTES IN THESE DISPARATE DISCIPLINES. THERE ARE COMPUTER PROGRAMS TO ESTIMATE SYSTEM PERFORMANCE AGAINST THE THREAT, COMPUTER MODELS TO PREDICT RELIABILITY IN A GIVEN ENVIRONMENT, AND COST MODELS TO ESTIMATE BOTH ACQUISITION AND OPERATIONS OVER TH6 LIFE OF A S ...
SBIR Phase I 1991 Department of DefenseNavy -
HF POWER SUPPLY FOR SUBMARINE COMBAT SYSTEMS
SBC: DEEGAN RESEARCH GROUP, INC. Topic: N/ARELIABLE AND CONTINUOUS POWER TO SUBMARINE ELECTRONICS IS ESSENTIALFOR MISSION EXECUTION AND FOR THE SAFE OPERATION OF THE SHIP. DIGITAL ELECTRONICS CANNOT CONTINUE OPERATION THROUGH EVEN VERY SHORT POWER OUTAGES CAUSE BY BUS TRANSFER DEVICES, THAT HAVE HISTORICALLY BEEN SUFFICIENT FOR ANALOG COMBAT SYSTEMS. THE RESTART AND RELOAD THAT A DIGITAL SYSTEM MUST EXECUTE AFTER A SHORT POWER INTERRUPTION ...
SBIR Phase I 1991 Department of DefenseNavy -
AUTOMATIC CALIBRATION ELECTROMAGNETIC FLUXGATE AIRCRAFT SENSOR SYSTEM
SBC: KVH INDUSTRIES, INC. Topic: N/AKVH INDUSTRIES PROPOSES TO DEVELOP A TOP LEVEL DESIGN FOR AN ELECTROMAGNETIC FLUXGATE AIRCRAFT SENSOR, WITH AN AUTOMATIC CALIBRATION CAPABILITY. THE PROPOSED ELECTROMAGNETIC SENSOR WILL CONNECT TO AN INTERFACE BOX COMPATIBLE WITH MIL-STD 1553 REQUIREMENTS.IT WILL FUNCTIONALLY AND PHYSICALLY REPLACE THE MAGNETIC SENSORS ON THE U.S. NAVY'S MA-1, S/AHRS, EXISTING AIR FORCE SYSTEMS AND THE PROPOSED C/ ...
SBIR Phase II 1991 Department of DefenseNavy -
AUTOMATIC CALIBRATION ELECTROMAGNETIC FLUXGATE AIRCRAFT SENSOR SYSTEM
SBC: KVH INDUSTRIES, INC. Topic: N/AN/A
SBIR Phase I 1989 Department of DefenseNavy -
OCEAN WAVE ENERGY CONVERTER
SBC: Ocean Wave Energy Co Topic: N/AMAJOR AIDS TO NAVIGATION (ATON) ARE ESSENTIAL SIGNPOSTS FOR SAFE PASSAGE ALONG COASTAL AND OFFSHORE SEAWAYS. PRESENTLY, THEIR SIGNALS ARE POWERED BY ON-SITE ENGINE GENERATORS REQUIRING CONSIDERABLE AND COSTLY MAINTENANCE. ATON AUTONOMY WILL BE GREATLY INCREASED WITH DEEP DISCHARGE BATTERY TECHNOLOGY PROVIDING THAT ON-SITE CHARGING SOURCES ARE USED. AMONG NATURALLY AVAILABLE SOURCES, THE UNCEASING ...
SBIR Phase I 1989 Department of Transportation