List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. Ultra Wide Bandwidth High Dynamic Range Digital ISR Receivers for the submarine force

    SBC: SYSTEMS ENGINEERING ASSOCIATES CORPORATION            Topic: N101059

    This effort to improve the capabilities of the ESM system will increase the reliability and reduce lifecycle support costs of the Radar Wideband (RWB) subsystem on submarines. Analog to digital converter (A/D) based digital receivers will be applied to yield improvements in Radar signal acquisition and processing. In-phase and Quadrature (I/Q) data streams will be created from which intra pulse mo ...

    SBIR Phase II 2012 Department of DefenseNavy
  2. TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.

    SBC: The Associated Corp            Topic: N/A

    TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...

    SBIR Phase I 1984 Department of DefenseNavy
  3. N/A

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseNavy
  4. N/A

    SBC: JAMES R. MODEN, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseNavy
  5. N/A

    SBC: JAMES R. MODEN, INC.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of DefenseNavy
  6. N/A

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseNavy
  7. N/A

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of DefenseNavy
  8. N/A

    SBC: Pilgrim Screw Corp.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseNavy
  9. N/A

    SBC: PYRCON, LLC            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseNavy
  10. Submarine ES System RF Groom&Certification

    SBC: SYSTEMS ENGINEERING ASSOCIATES CORPORATION            Topic: N08T015

    US Navy submarine forces currently employ an independent team to test, measure, calibrate and certify radio frequency (RF) signal paths through sail mounted antennae to the inboard radio rooms in a process that can take in excess of 60 man-days to complete. Ships personnel have no means of calibrating or performing an operational verification of the ES suite once underway. Ships have no means of p ...

    STTR Phase II 2012 Department of DefenseNavy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government