You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Automated Through Thickness Reinforcement for Affordable & Robust High Temperature Composite Structures
SBC: James L. Gallagher, Inc. Topic: DLA231D07The national imperative to field hypersonic weapon systems has increased the demand for robust, lightweight, and affordable high temperature materials for thermal protection systems. Refractory composites such as carbon-carbon (C/C) or carbon/SiC (C/SiC) offer enormous promise, but wider-scale acceptance continues to be hindered by certain technical and affordability limitations. Key among the ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
Intelligent Automatic Serial Sectioning using Ultra Short Pulse Laser Polygon Scanning
SBC: AEROCYONICS, INC. Topic: DMEA211002Serial sectioning of microelectronics, as needed for performing destructive, high-resolution reverse engineering and failure analysis, faces several challenges, due to the ever-growing miniaturization of features of interest. Some of these challenges are as follows: (1) Current methods of delayering require access to multiple pieces of mechanical equipment such as semi-automated polishing mach ...
SBIR Phase I 2021 Department of DefenseDefense Microelectronics Activity -
Fuel Cell Phase I Qualification and UH-1Y Crashworthy Prototypes
SBC: Response Technologies, LLC Topic: DLA182001There are over 123 UH-1Y aircraft in service today, each equipped with five internal fuel cells, with an average cost of $15k per fuel cell. The current supply chain for UH-1Y fuel cells is not able to meet delivery nor quality requirements, which has resulted in a significant force readiness issue. With this SBIR Phase II proposal, Response Technologies (RT) aims to: 1) “Phase I Qualify” a co ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Manufacturing and Validation Development of RF Reflector
SBC: Response Technologies, LLC Topic: DLA202001Response Technologies’ goal is to provide the DLA and the USAF with qualified self-sealing fuel cells for the F-16 aircraft platform. A bi-product of this effort will be proven tank constructions for other legacy aircraft and the future vertical lift. This Phase I’s effort spans three to six months and is characterized by identifying and documenting all requirements and test methods to qua ...
SBIR Phase I 2021 Department of DefenseDefense Logistics Agency -
Additively Manufactured A-10 Fuel Cells
SBC: Response Technologies, LLC Topic: DLA201001Response Technologies’ goal is to provide the DLA and the USAF with qualified self-sealing fuel cells for the A-10 aircraft platform. A bi-product of this effort will be proven tank constructions for other legacy aircraft and the future vertical lift. This Phase I’s effort spans three to six months and is characterized by identifying and documenting all requirements and test methods to qualify ...
SBIR Phase I 2020 Department of DefenseDefense Logistics Agency -
Additively Manufactured Inflatable Hulls- Improved Survivability- 20% Total Ownership Cost Reduction
SBC: Response Technologies, LLC Topic: DLA152001Seam failures of flexible inflatable hulls is the primary reason for failures of military RHIBS and CRCs.These failures are a result of the current manufacturing methods being used, and which have been in place for over fifty years.Whats more, the manufacturing methods and fragmented supply chain of these hulls result in very long and unreliable lead times.These shortcomings impact the survivabili ...
SBIR Phase II 2018 Department of DefenseDefense Logistics Agency -
Intelligent Ultrafast Laser System for Inspection of Microelectronics
SBC: AEROCYONICS, INC. Topic: DMEA192002Detecting counterfeit electronics is an important area of rising concern for DOD, other federal agencies and the private sector. The advent of cloned chips has called for development of new inspection tools that are capable of inspecting microelectronics down to the nanometer length scale. The state-of-the-art technology in Microscopy currently lacks a one-size-fits-all microelectronics inspection ...
SBIR Phase I 2020 Department of DefenseDefense Microelectronics Activity -
Rotorcraft Fuel Bladder Weight and Total Ownership Cost Reduction
SBC: Response Technologies, LLC Topic: DLA182001Response Technologies will attempt to build H-60 fuel cell prototypes and qualify to a portion of MIL-DTL-27422F’s Phase II performance testing criteria [Class B – Semi rigid or self-supporting fuel construction, Type I – Self-sealing, and Protection Level C – Full self-sealing against 50 caliber and partial self-sealing against 14.5 mm] . Response Technologies uses an additive manufacturi ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Rotorcraft Fuel Bladder Weight and Total Ownership Cost Reduction
SBC: Response Technologies, LLC Topic: DLA182001Response Technologies will attempt to qualify to MIL-DTL-27422Fs phase I performance testing criteria for thefuel cell test cubes[Class BSemi rigid or self-supporting fuel construction, Type ISelf-sealing, and Protection Level CFull self-sealing against 50 caliber and partial self-sealing against 14.5 mm] .Response Technologiesuses an additive manufacturing process that initially creates a textile ...
SBIR Phase I 2018 Department of DefenseDefense Logistics Agency -
Seamless Flexible Fuel Tanks- 65% TOC Reduction
SBC: Response Technologies, LLC Topic: DLA152001The DoD uses flexible fuel bladders in multiple air, ground, and sea vehicles because they: 1) easily fit into almost any space, 2) are corrosion resistant, and can often be self-sealing and explosion resistant, 3) allow for customized placement of fittings and connection points, and 4) these flexible tanks can collapse as they empty, thereby reducing the need for venting and minimizing sloshing a ...
SBIR Phase II 2016 Department of DefenseDefense Logistics Agency