You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Transportation System Performance Measurement Using Existing Loop Infrastructure

    SBC: CLR ANALYTICS INC            Topic: 102FH2

    With continuing emphasis on transportation sustainability and fiscal stewardship, utilizing existing loop detector infrastructure to obtain more accurate, reliable and comprehensive traffic system performance measures is desired by many transportation agencies. In Phase I study, we found that the capability of the Inductive Loop Detector (ILD) signature technology to re-identify and classify vehic ...

    SBIR Phase II 2013 Department of Transportation
  2. Smartphone Signal Alert Status

    SBC: Savari Inc.            Topic: 111FH1

    The primary objective for Phase I was to design and develop a proof of concept system demonstrating the basic functionality and feasibility to deploy technology in the field. During the six-month effort, a detailed Concept of Operations document was prepared that served as a foundation for the design and development of the SmartCross system. The core components of the system: (a) Smartphone applic ...

    SBIR Phase II 2013 Department of Transportation
  3. Augmenting Inductive Loop Vehicle Sensor Data with SPAT and GrID (MAP) via Data Fusion

    SBC: Savari Inc.            Topic: 111FH2

    In this proposal, we have proposed a program for twenty months to build on the basic ideas and feasibility developed in Phase I of this SBIR in order to demonstrate the practical use of DSRC technologies with signal controller for adaptive timing with a goal towards commercialization. Specifically, we intend to further develop, build and integrate advanced signal control algorithms that make use o ...

    SBIR Phase II 2013 Department of Transportation
  4. Broadband Quadrature Mixers with Integrated I/Q Mismatch Calibration

    SBC: CREONEX SYSTEMS INC.            Topic: DMEA102002

    Communication SoC technology has advanced significantly over the past ten years resulting in highly integrated radio SoC chips for standards such as Wi-Fi, global position system (GPS), Bluetooth (BT), 3G cellular, digital TV (DTV), and cable modems. While most radio SoC"s are narrowband (e.g. WiFi, GPS, BT, and cellular), future trends favor broadband software defined radios (SDR) and cognitive r ...

    SBIR Phase II 2013 Department of DefenseDefense Microelectronics Activity
  5. High-Performance Arbitrated Logic Processing Topology

    SBC: Physical Optics Corporation            Topic: SOCOM13007

    To address the SOCOM need for field-operable computing"bricks", Physical Optics Corporation (POC) proposes to develop High-performance Arbitrated LOgic processing Topology (HARLOT) device. HARLOT is a computing brick housed in a man-portable, ruggedized package designed for field use and offers>16 Terabyte non-volatile memory and>1 TeraFLOPS computational capability while consuming

    SBIR Phase I 2013 Department of DefenseSpecial Operations Command
  6. C-Care: An automated combat casualty diagnostic and monitoring system

    SBC: UTOPIACOMPRESSION,CORPORATION            Topic: SOCOM13003

    UtopiaCompression and team put forth a novel solution for medical diagnostics and continuous monitoring of combat casualties in the battlefield to improve survivability while reducing cost to the military. We propose advances in both physiological diagnostic intelligence and associated physiological sensors systems for a complete solution. The system will consist of the state of the art physiologi ...

    SBIR Phase I 2013 Department of DefenseSpecial Operations Command
  7. Family of Sub-Sonic Ammunition

    SBC: Southwest Services LLC            Topic: SOCOM13005

    This program will consist of a three prong approach to provide an unbiased assessment and development of subsonic ammunition with the highest success rate balanced against technological advancement. Our feasibility study will include: 1) A brass case utilizing a polymer insert to optimize subsonic interior ballistics, 2) A lightweight low cost aluminum cartridge case utilizing a polymer insert, ...

    SBIR Phase I 2013 Department of DefenseSpecial Operations Command
  8. Tracking of heavy vehicles for estimating heavy load distribution across the highway system and Weigh-In-Motion Calibration

    SBC: CLR ANALYTICS INC            Topic: 122FH4

    Weigh-In-Motion (WIM) has been employed as a major technology to collect heavy vehicles’ data on the freeways. Because WIM is one of the most costly and sophisticated data collection system, how to effectively utilize the valuable WIM data, monitor WIM stations' performance, and identify out of calibration stations are especially important. In this project, we propose an innovative and yet pract ...

    SBIR Phase I 2013 Department of Transportation
US Flag An Official Website of the United States Government