You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Thickness Measurement Technology for Thin Films on Sapphire Substrate

    SBC: ADVANCED COOLING TECHNOLOGIES INC            Topic: DMEA16B001

    Silicon-on-sapphire (SOS) integrated circuits have achieved popularity due to their high speed performance and low power consumption in radio frequency applications. An important aspect of the SOS fabrication process that must be verified to maximize yield is the thickness of the thin films deposited on the sapphire substrate. However, due to the transparent nature of sapphire, current optical met ...

    STTR Phase II 2018 Department of DefenseDefense Microelectronics Activity
  2. Rapid Assessment of Air Void System in Fresh Concrete

    SBC: CREARE LLC            Topic: 171FH2

    Proposal title: Rapid Assessment of Air Void System in Fresh Concrete Water expansion during freeze-thaw cycles can cause deterioration in concrete, leading to scaling, cracking, and crumbling over a period of years. Resistance to this damage is achieved with a system of voids formed by adding surfactants to the fresh concrete to stabilize air bubbles naturally entrained during mixing. The volume ...

    SBIR Phase II 2018 Department of Transportation
  3. Broken Rail Detection from Flashing Rear End Device

    SBC: CREARE LLC            Topic: 171FR2

    Proposal title: Broken Rail Detection from Flashing Rear End Device Broken rails are a common cause of mainline derailments and a particular concern given the increasing use of our rail system for passenger traffic and petroleum products. The progressive nature of the defects provides an opportunity for early detection of cracks before they become significant enough to cause a derailment. Unfortu ...

    SBIR Phase II 2018 Department of Transportation
  4. NON-INVASIVE NEUROENHANCEMENT TO OPTIMIZE AUTONOMIC NERVOUS SYSTEM REGULATION AND BEHAVIORAL HEALTH WITH TRANSCUTANEOUS VIBRATORY STIMULATION

    SBC: Apollo Neuroscience, Inc.            Topic: SOCOM182002

    Apollo is a patent-pending AI software platform that integrates with connected hardware to deliver physiologically-reactive vibration, demonstrated in a double-blind randomizedplacebo-controlled clinical trial, to improve resilience, as measured by heart rate variability, and performance under stress by up to 25%.Using physiological measurement and environmental data, Apollo identifies each users ...

    SBIR Phase I 2018 Department of DefenseSpecial Operations Command
  5. A Multimodal Acoustic Tool for Inline Pipe Inspection

    SBC: CREARE LLC            Topic: 180PH1

    A Multimodal Acoustic Tool for Inline Pipe Inspection 3/19/2018 The US energy transport pipeline system is a longstanding distribution network with most of its still standing pipes being installed between the 1950s–1970s. Due to degradation mechanisms, such as embrittlement, capable of causing a two-fold reduction in fracture toughness, pipe rupture is a major risk. Current nondestructive ins ...

    SBIR Phase I 2018 Department of Transportation
  6. NDT of Fracture Toughness for Pipeline Steels

    SBC: FBS INC            Topic: 180PH1

    NDT of Fracture Toughness for Pipeline Steels 3/16/2018 Ultrasound-based technology to nondestructively determine fracture toughness of pipeline steels will be developed. Fracture toughness is the material parameter that, along with applied loading and flaw geometry, dictates the critical crack size, and therefore controls the flaw size that must be detected during inspections. A major challeng ...

    SBIR Phase I 2018 Department of Transportation
  7. Rapid Acquisition Demonstrator

    SBC: SciSwift LLC            Topic: SOCOM18004

    This proposal is for a feasibility study on the creation of an integrated software development platform to demonstrate how software projects can rapidly, reliably, and securely be created nearly on-demand. Furthermore, this study attempts to solve the rating and vetting of developers problem, based on their code quality, efficiency, and work product, using a novel machine learning system.The study ...

    SBIR Phase I 2018 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government