You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Advanced thin film thermal battery

    SBC: BINERGY SCIENTIFIC, INC.            Topic: MDA16T001

    Thermal batteries are single-discharge reserve batteries that provide a very long shelf life, minimal self-discharge, wide storage temperature range, fast activation under sudden power demand, and also a wide range of temperature operating conditions. 32Upon activation, thermal batteries are heated with an internal pyrotechnic heat charge above the melting temperature of the molten salt electrolyt ...

    STTR Phase II 2023 Department of DefenseMissile Defense Agency
  2. SBIR Phase I: A Physics-Informed/Encoded Polymer Informatics Platform for Accelerated Development of Advanced Polymers and Formulations

    SBC: MATMERIZE, INC.            Topic: AI

    The broader/commercial impacts of this Small Business Innovation Research (SBIR) Phase I project are to transform the way in which polymeric materials are developed. Adopting the most advanced artificial intelligence (AI) techniques, the proposed technology seeks to dramatically accelerate the exploration of new polymer formulations, efficiently and accurately discovering those with targeted perfo ...

    SBIR Phase I 2023 National Science Foundation
  3. Performance Enhancement of Hydrokinetic Arrays Using Reliable, Low-Cost Dynamic Components

    SBC: EMRGY INC            Topic: 1

    Emrgy, Inc., a pioneer in commercializing hydrokinetic power systems, is teaming with Premier Energy Holdings, Stanford University and University of Tennessee, Knoxville to develop a highly innovative solution to low-cost, riverine and tidal-based clean energy power generation. The project will implement “dynamic tuning” of the hydrokinetic turbine system to optimize performance across variabl ...

    SBIR Phase II 2021 Department of EnergyARPA-E
  4. SBIR Phase I:A physics-based machine learning platform for crystal structure prediction of small drug molecules

    SBC: Lavo Life Sciences LLC            Topic: PT

    The broader impact of this Small Business Innovation Research (SBIR) Phase I project is to accelerate and reduce the cost of the early stages of small molecule pharmaceutical research. The number of drugs a pharmaceutical company can bring to market is limited by the time, cost, and complexity involved in developing each drug. The research and development process typically takes around 10 years, a ...

    SBIR Phase I 2023 National Science Foundation
  5. STTR Phase I:Space Debris Awareness Spectrum

    SBC: GuardianSat LLC            Topic: SP

    The broader impact/commercial potential of this Small Business Technology Transfer (STTR) Phase I project will develop methods for space-based detection of orbital debris. This technology may decrease risks of collisions in space through real-time, accurate identification and modeling of objects within the respective orbits of the spacecraft. The system will also assist with potential path deviati ...

    STTR Phase I 2023 National Science Foundation
  6. STTR Phase I:Novel State of Health Measurements Through Advanced Lithium-ion Battery Modeling for Secure and Scalable 2nd-Life Battery Deployment

    SBC: Parthian Battery Solutions, LLC            Topic: M

    The broader impact/commercial potential of this Small Business Technology Transfer (STTR) Phase I project is the accelerated adoption of electrification and other next-generation technologies, like renewable energy. This project proposes a technology to effectively manage end-of-life lithium-ion batteries through reuse. Enabling these batteries to be safely incorporated into a circular/reuse econo ...

    STTR Phase I 2023 National Science Foundation
  7. SBIR Phase I: Dynamic OneSource Geospatial Information System for Maximizing Agricultural Yields

    SBC: EARTH MAPPING INTERNATIONAL, INC.            Topic: ET

    The broader/commercial impact of this Small Business Innovation Research (SBIR) Phase I project is the creation of a dynamic geospatial database that can be mined to further develop precision models of soil moisture and farm productivity that will aid small- to medium-sized farms. These farms cover almost 75% of the operating farmland in the U.S. Large companies in the agriculture industry benefit ...

    SBIR Phase I 2023 National Science Foundation
  8. SBIR Phase I:Versatile Polymers for Making New Components in Space and Eliminating Solid Waste

    SBC: Polymer Solutions Inc            Topic: SP

    The broader impact/commercial potential of this Small Business Innovation Research (SBIR) project is to address the need for recycling plastics that have surpassed their useful life. The ‘plastic’s revolution’ of the mid-twentieth century has greatly added value to society but has also created highly durable plastics that are used to make objects of limited life-expectancy. There are limited ...

    SBIR Phase I 2023 National Science Foundation
  9. SBIR Phase I:Solving Minority Equity in Science, Technology, Engineering, and Mathematics (STEM) with Artificial Intelligence (AI)-Driven Workforce Development

    SBC: Sheffie Robinson            Topic: AI

    The broader/commercial impact of this Small Business Innovation Research (SBIR) Phase I project is to enhance Science, Technology, Engineering and Mathematics (STEM) career awareness in minorities by engaging their interests and correlating those interests with real career aspirations. The research aligns with diversity, equity, and inclusion goals in STEM fields, exposing students in secondary sc ...

    SBIR Phase I 2023 National Science Foundation
  10. SBIR Phase II:A New Class of High-Conductivity Solid-state Composite Electrolytes for Next-Generation Lithium Batteries

    SBC: NEXTGEN BATTERY TECHNOLOGIES, LLC            Topic: EN

    The broader impact/commercial potential of this Small Business Innovative Research (SBIR) Phase II project is the introduction of non-flammable, easy-to-manufacture solid battery electrolytes that are also compatible with lithium metal. The cell architecture seeks to ensure safety while enabling a significant improvement in the energy density.The teams also seeks to lower the costs of the lithium- ...

    SBIR Phase II 2022 National Science Foundation
US Flag An Official Website of the United States Government