You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: ADVANCED COMPONENTS & MATERIALS, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseAir Force
  2. Compliant Brush Shroud Casing Development for Aircraft Engine Compressors

    SBC: ADVANCED COMPONENTS & MATERIALS, INC.            Topic: N/A

    The proposed Phase II program will optimize the design and manufacturing process of a compliant brush shroud casing. Recent tests at Wright Laboratories with staged brush seals have demonstrated significantly increased blade to shroud rub tolerance of acompliant casing. Phase I of the program is expected to demonstrate the feasibility of two innovative brush shroud designs with lower cost and we ...

    SBIR Phase I 2001 Department of DefenseAir Force
  3. Compliant Brush Shroud Casing Development for Aircraft Engine Compressors

    SBC: ADVANCED COMPONENTS & MATERIALS, INC.            Topic: N/A

    The proposed Phase II program will optimize the design and manufacturing process of a compliant brush shroud casing. Recent tests at Wright Laboratories with staged brush seals have demonstrated significantly increased blade to shroud rub tolerance of acompliant casing. Phase I of the program is expected to demonstrate the feasibility of two innovative brush shroud designs with lower cost and we ...

    SBIR Phase II 2001 Department of DefenseAir Force
  4. N/A

    SBC: AEROMECHANICS, LLC            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseArmy
  5. N/A

    SBC: Applied Radar, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseAir Force
  6. Affordable Control/Trajectory Management Systems for Unmanned Air or Space Vehicles

    SBC: Veloxiti, Inc.            Topic: N/A

    There is a major need for unmanned vehicles that act autonomously from humans,thereby reducing both the amount of supervision necessary and the cost associatedwith their operation. In order to accomplish this task, autonomous vehicles musthave the ability to make decisions, assess their health and environment, dynamicallyre-plan, and control their movements in a dynamic and unpredictable environm ...

    SBIR Phase I 2001 Department of DefenseAir Force
  7. Wide Band Gap ZnO p-n Junction

    SBC: CERMET, INC.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of DefenseMissile Defense Agency
  8. Seeded Melt Growth of Pure and Stabilized ZnO Bulk Single Crystals

    SBC: CERMET, INC.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of DefenseMissile Defense Agency
  9. N/A

    SBC: CERMET, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseMissile Defense Agency
  10. Development of a Truly Lattice-Matched III-Nitride Technology for

    SBC: CERMET, INC.            Topic: N/A

    Cermet, in collaboration with researchers at Georgia Institute of Technology, proposes to implement a lattice matched III-Nitride technology using existing substrates. The implementation of a lattice matched substrate promises to produce near dislocationfree III-Nitrides for the first time while the use of an existing substrate technology dramatically lowers development cost and reduces the devel ...

    STTR Phase I 2001 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government