You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Fusing Uncertain and Heterogeneous Information Making Sense of the Battlefield

    SBC: Veloxiti, Inc.            Topic: OSD12LD2

    The militarys increasingly capable net-centric environment offers clear benefits and undeniable challenges. Due to the development of new sensor platforms and sensor technologies, physics-based information capabilities have increased but limitations on human/system exploitation capabilities have limited sensor tasking such that these capabilities are underutilized. IF there were enough people and ...

    SBIR Phase II 2014 Department of DefenseOffice of the Secretary of Defense
  2. Conformal Appliqué Antennas for Unmanned Aerial Vehicles and Aircraft

    SBC: WANG ELECTRO-OPTO CORPORATION            Topic: SOCOM06002

    This SBIR phase-II proposal is to develop conformal appliqué antennas mounted on Unmanned Aerial Vehicles (UAV) and aircraft for FM/TV broadcast in PSYOPS (psychological-operations). The technical problem is very challenging, especially for that on UAVs, because of the constraints on antenna size and form factor by the platform, and since the gain-bandwidth of an antenna is fundamentally limited ...

    SBIR Phase II 2007 Department of DefenseSpecial Operations Command
  3. N/A

    SBC: SA Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  4. N/A

    SBC: SCIENTIFIC RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice of the Secretary of Defense
  5. N/A

    SBC: EARTH MAPPING INTERNATIONAL, INC.            Topic: N/A

    Not Available ORBITEC proposes the development of a Lunar Ice Simulator (LIS). The objective of the research is to create a system that can simulate the physical structure of the lunar ice/dust mixtures to test and demonstrate mechanisms for the mining and processing o

    SBIR Phase I 2000 Department of Transportation
US Flag An Official Website of the United States Government