You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Reduced Size, Weight, and Power, Enhanced Range Electro-Optical and Infrared Sensor Suites
SBC: PHELPS2020, INC Topic: SOCOM15004Phelps2020 proposes a low SWaP solution, ARRIS, to the improvement of the range and resolution of the MX-15 turret so they equal or exceed the capabilities of the MX-20 turret. We chose to keep the MX-15 turret as is and append to it a low SWaP accelerated processor that performs real-time FMV enhancement. A multi-layer software application addresses illumination, weather, and environmental limita ...
SBIR Phase II 2016 Department of DefenseSpecial Operations Command -
Helmsman's Recording Accelerometer (HRA)
SBC: Applied Measurement Systems, Topic: N/ASpecial Operations Forces (SOF) require a real time display of appr opriate data to allow the helmsman to access the damage potential to his cargo (equipment/personnel) and support his decision relative to speed and course selection when operating in rough water. Furthermore, maintenance support personnel need quantitative data to support design decisions and maintenance activities. This proposa ...
SBIR Phase I 1997 Department of DefenseSpecial Operations Command -
LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING
SBC: KVH INDUSTRIES, INC. Topic: N/APRESENT TRAIN DETECTION SCHEMES RELY LARGELY ON A LOW RESISTANCE THROUGH THE TRAIN'S WHEELS TO PERTURBATE A STABLE ELECTRICAL CIRCUIT. WHILE ELEGANT IN PRINCIPLE, THE DESIGN IS PLAGUED BY OXIDE FILMS AND MATERIAL BUILDUP ON THE RAIL, SNEAK PATHS THROUGH THE BALLAST AND OTHER UNCONTROLLABLE VARIABLES. KVH INDUSTRIES PROPOSES TO DESIGN AND DELIVER A "SMART MAGNETOMETER"-BASED SENSOR PACKAGE WHICH WI ...
SBIR Phase II 1995 Department of Transportation -
Supercharged Diesel Non-Gasoline Burning Outboard Engine
SBC: GS ENGINEERING INC Topic: N/AThis proposal outlines an SBIR Phase I supercharged uniflow diesel non-gasoline burning outboard engine design capable of diesel fuel operation and lightweight construction. Inherent specific weight penalties of the Diesel cycle being inversely proportional to specific displacement, indicates a scale reduction of these engines demand greater design discipline relative to the combustion physics th ...
SBIR Phase I 1995 Department of DefenseSpecial Operations Command