You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MATT Insertion of Imagery/High Speed Fleet Broadcast Receive Capability

    SBC: Aeronix, Inc.            Topic: N/A

    The Aeronix Phase I task will address the problem of incorporating Imagery/High Speed Fleet Broadcast (HSFB) Receive Only Capability into the Multi-Mission Advanced Tactical Terminal (MATT) System. The significance of this effort is providing additional capability for field users of the MATT system. The MATT system connects military platforms with secure communications networks to provide tactical ...

    SBIR Phase II 1995 Department of DefenseSpecial Operations Command
  2. AUTOMATED VIDEO DATA REDUCTION SYSTEM

    SBC: Dba Systems, Inc.            Topic: N/A

    DBA SYSTEMS, INC. PROPOSES TO FABRICATE AN ENGINEERING MODEL OF A PC-BASED VIDEO MENSURATION SYSTEM FOR THE DETAILED HUMAN FACTORS ANALYSIS ASSOCIATED WITH MOTOR VEHICLE OPERATION. THE BASELINE FOR THIS SYSTEM WILL BE DBA'S OFF-THE-SHELF 626 VIDEO TRACKER THAT TRACKS VIDEO IMAGES AT REAL-TIME RATES (60 HZ). ENHANCEMENBTS WILL INCLUDE THE DEVELOPMENT OF REAL-TIME FITTING AND LATERAL POSITIONING ALG ...

    SBIR Phase II 1995 Department of Transportation
  3. LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    PRESENT TRAIN DETECTION SCHEMES RELY LARGELY ON A LOW RESISTANCE THROUGH THE TRAIN'S WHEELS TO PERTURBATE A STABLE ELECTRICAL CIRCUIT. WHILE ELEGANT IN PRINCIPLE, THE DESIGN IS PLAGUED BY OXIDE FILMS AND MATERIAL BUILDUP ON THE RAIL, SNEAK PATHS THROUGH THE BALLAST AND OTHER UNCONTROLLABLE VARIABLES. KVH INDUSTRIES PROPOSES TO DESIGN AND DELIVER A "SMART MAGNETOMETER"-BASED SENSOR PACKAGE WHICH WI ...

    SBIR Phase II 1995 Department of Transportation
  4. Supercharged Diesel Non-Gasoline Burning Outboard Engine

    SBC: GS ENGINEERING INC            Topic: N/A

    This proposal outlines an SBIR Phase I supercharged uniflow diesel non-gasoline burning outboard engine design capable of diesel fuel operation and lightweight construction. Inherent specific weight penalties of the Diesel cycle being inversely proportional to specific displacement, indicates a scale reduction of these engines demand greater design discipline relative to the combustion physics th ...

    SBIR Phase I 1995 Department of DefenseSpecial Operations Command
  5. The Application of Advanced Technology to Traffic Enforcement

    SBC: Anacapa Sciences, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
US Flag An Official Website of the United States Government