You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: 081FH2

    City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...

    SBIR Phase II 2010 Department of Transportation
  2. Transportation Autonomous Device

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: 101FR4

    Railroad yards are in constant movement with potentially thousands of train cars moving over miles of track compressed into a limited area. The harsh environment presents many safety hazards for railroad workers who must move through this environment and perform assigned tasks. Job related injuries cost he railroads over $1 billion annually and from 2008 30.3% of those injuries occurred in the r ...

    SBIR Phase I 2010 Department of Transportation
  3. Maritime Surveillance Sensing Using Underwater High Frequency Acoustic Communication Receivers

    SBC: Advanced Acoustic Concepts, Inc.            Topic: SOCOM06013

    High-frequency acoustic modems are required to provide undersea communication networks to support covert surveillance operations. These modems can also be used as platforms for compact, low power surveillance sensors and processing. A natural first step would be to integrate a capability for passive acoustic detection of ships and submarines. A multi-phase effort is proposed for integrating passiv ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  4. Concrete Environmental Monitoring Sensor

    SBC: AVS US INC            Topic: 07FH3

    With infrastructure costs escalating it is becoming essential to monitor the health of concrete structures so that timely maintenance can maximize their useful lives. This SBIR will demonstrate the feasibility of using a passive sensor, embedded within concrete, to measure mositure, temperature, pH and concentrations of chlorides. It will provide critical data for evaluating concrete performance s ...

    SBIR Phase I 2008 Department of Transportation
  5. Environmental Pavement Monitor

    SBC: AVS US INC            Topic: 07FH3

    With infrastructure costs escalating it is becoming essential to monitor the health of asphalt and concrete pavement so that timely maintenance can maximize their usefulness. This SBIR will develop a sensor that can be embedded within concrete or asphalt, which can measure moisture, temperature, stress and strain. It will provide critical data for evaluating pavement performance starting with th ...

    SBIR Phase II 2009 Department of Transportation
  6. Safe Track Protection and Advance Warning System

    SBC: WAVETRONIX LLC            Topic: 082FH1

    To improve safety and efficiency on high-speed signalized intersections a dilemma zone protection system has been designed to automatically configure site-specific protection boundaries on both main-street approaches by continously tracking vehicles within up to 1000 feet of each stop line. The system will further customize and refine protection by continously estimating the probability of a seve ...

    SBIR Phase I 2009 Department of Transportation
  7. A Higher Performance Traffic Detector Built on SmartSensor HD and Multi-Beam Radar Technology

    SBC: WAVETRONIX LLC            Topic: 091FH3

    Wavetronix currently sells the SmartSensor HD radar detection which is the highest performance above ground detector currently available. However, the count, speed and classification accuracy can be significantlly improved by employing multi-beam radar technology which we have recently developed. Multi-beam radar technology allows multiple radars to be used cost effectively inside a single senso ...

    SBIR Phase I 2009 Department of Transportation
  8. AN INTERACTIVE, NATIONWIDE GEOGRAPHICAL INFORMATION SYSTEM TO ADMINISTER HIGHWAY ROUTE DESIGNATIONS FOR THE TRANSPORTATION OF HAZARDOUS MATERIALS

    SBC: Aegis Information Systems            Topic: N/A

    IN ACCORDANCE WITH THE HAZARDOUS MATERIALS TRANSPORTATION UNIFORM SAFETY ACT OF 1990 (HMTUSA), DOT IS NOW REQUIRED TO CREATE A CENTRALIZED DATABASE OF STATE-DESIGNATED HAZARDOUS MATERIAL HIGHWAY ROUTES. DOT IS ALSO RESPONSIBLE FOR PERIODICALLY UPDATING AND PUBLISHING A LIST OF CURRENLY EFFECTIVE HAZARDOUS MATERIALS HIGHWAY ROUTE DESINGATIONS IN THE FEDERAL REGISTER. IN RESPONSE TO THIS NEED, AEGIS ...

    SBIR Phase II 1995 Department of Transportation
  9. AN INTERACTIVE, NATIONWIDE GEOGRAPHICAL INFORMATION SYSTEM TO ADMINISTER HIGHWAY ROUTE DESIGNATIONS FOR THE TRANSPORTATION OF HAZARDOUS MATERIALS

    SBC: Aegis Information Systems            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
  10. FEASIBILITY STUDY

    SBC: ANALYSIS & SIMULATION, INC.            Topic: N/A

    A NEED EXISTS TO DEVELOP SYSTEMS THAT CAN DETECT EMERGENCY AND/OR ABNORMAL OPERATIONS OF GENERAL AVIATION AIRCRAFT AND WARN OR ALERT THE PILOT OF ITS EFFECT AND RECOMMEND PROCEDURES. THE OBJECTIVE OF THIS PHASE I STUDY IS TO INVESTIGATE THE APPLICABILITY OF ARTIFICIAL INTELLIGENCE TECHNOLOGY TO THE SOLUTION OF THIS PROBLEM. THE APPROACH INVOLVES: (1) CLARIFICATION OF THE OVERALL EMERGENCY SITU- AT ...

    SBIR Phase I 1986 Department of Transportation
US Flag An Official Website of the United States Government