You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Enhanced Canine Performance, Protection and Survivability

    SBC: OCEANIT LABORATORIES INC            Topic: SOCOM172002

    Oceanit proposes to develop novel nutraceutical and/or pharmaceuticals to enhance important USSOCOM Multi-Purpose Canine (MPC) performance attributes that optimize their performance, improve recovery time when wounded and increase their survivability.

    SBIR Phase I 2018 Department of DefenseSpecial Operations Command
  2. Geo-registration of Aerial Imagery Using 3-D Volumetric Models

    SBC: VISION SYSTEMS INC            Topic: NGA11001

    With the advancement of aerial imaging sensors, high quality data equipped with partial sensor calibration models is available. There is a recent research activity in computer vision community that aims to reconstruct 3-d structure of the observed scenes relying on the content of the imagery in fully automated ways. However the research has not matured into robust systems ready for operational set ...

    SBIR Phase II 2013 Department of DefenseNational Geospatial-Intelligence Agency
  3. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: 081FH2

    City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...

    SBIR Phase II 2010 Department of Transportation
US Flag An Official Website of the United States Government