You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Smart Well Assessment and Reservoir Management System (SWARMS)
SBC: OCEANIT LABORATORIES INC Topic: 22PH4Pipeline and Hazardous Materials Safety Administration (PHMSA) is actively involved in the safe transportation of energy and hazardous material that are vital to daily lives. This also includes underground natural gas storage (UNGS) maintenance and safe operation which are critical to nation's energy infrastructure. Enhancing leak detection and identifying smart ways to prevent potential well blow ...
SBIR Phase II 2023 Department of Transportation -
Edge Server-Based AI Application for Dilemma Zone and Traffic Conflict Events Detection
SBC: AIWAYSION INC Topic: 22FH2While AI-based techniques have been broadly embraced by transportation researchers and professionals due to their huge potential to significantly improve the efficiency and accuracy of analyzing transportation data, they typically require a large dataset to train the models effectively and experience difficulties in supporting real-time transportation operations and management. This project will u ...
SBIR Phase II 2023 Department of Transportation -
GEOGENX: target disambiguation through spatiotemporal context
SBC: VISION SYSTEMS INC Topic: NGA201004Satellite platforms play a critical role in the modern defense and intelligence infrastructure, providing timely, detailed, and readily available imagery to support U.S. national security. An ever present and fundamental requirement for this type of data is automated target detection and recognition, helping to quickly locate and correctly identify targets from vast quantities of image data. Despi ...
SBIR Phase II 2023 Department of DefenseNational Geospatial-Intelligence Agency -
Additively-Manufactured Insulated Propulsion Components (AMIPC)
SBC: Exo-Atmospheric Technologies LLC Topic: MDA21T005In Phase II, Exo-Atmospheric Technologies, LLC (EXO) will team up with multiple propulsion providers to fabricate throat inserts, pintles, and other structural components to verify and validate their Additively-Manufactured Insulating Propulsion Component (AMIPC) technology. EXO will use analysis tools to create components optimized for thermal insulation and structural performance utilizing multi ...
SBIR Phase II 2023 Department of DefenseMissile Defense Agency -
SkyShot: target detection through spatiotemporal context
SBC: VISION SYSTEMS INC Topic: NGA201004Satellite platforms play a critical role in the modern defense and intelligence infrastructure, providing timely, detailed, and readily available imagery to support U.S. national security. A fundamental requirement for this type of data is automated target detection and recognition, helping analysts to quickly locate and correctly identify targets of interest from vast quantities of image data. De ...
SBIR Phase II 2022 Department of DefenseNational Geospatial-Intelligence Agency -
Edge Computing and Sensor Fusion System for Comprehensive Monitoring of Traffic and Road Conditions
SBC: AIWAYSION INC Topic: 23FH2Real-time monitoring of traffic conditions is crucial for improving traffic safety and efficiency, and there is an urgent need for the development of in situ traffic sensing & computing technologies leveraging the recent advancements in edge computing. This project will develop an edge computing and sensor fusion system for comprehensive traffic and road conditions data collection and efficient tr ...
SBIR Phase I 2023 Department of Transportation -
SmartCam 3D (SC3D)
SBC: Rapid Imaging Technologies LLC Topic: AF191010As USSOCOM continues to assess the future operating environment, implementing innovative solutions that promote situational awareness (SA) is of increasing importance. While situational awareness can be tied to a variety of data-types impacting a mission, for the purposes of this effort, situational awareness tied to geospatial intelligence will be the focus. When a warfighter enters an operating ...
SBIR Phase II 2023 Department of DefenseSpecial Operations Command -
PVT DriveFit- A System to Deliver an Objective Quantifiable Measure of Driver Alertness
SBC: PULSAR INFORMATICS, INC. Topic: 21FM2In CMV operations, impaired alertness from driver fatigue contributes to a significant number of collisions and safety critical events. This project (through Phase II) will achieve a system to deliver an objective quantifiable measure of driver alertness based on the Psychomotor Vigilance Test (PVT). This system will alert drivers when assessments indicate alertness deficits and support the timely ...
SBIR Phase II 2022 Department of Transportation -
Synoptic approach to harmonize discrete data streams in application development
SBC: IT WORKS! INC. Topic: 180NH1Research conducted in Phase I identified a range of data sources providing vehicle related information to consumers shopping around or interested in knowing more about vehicles. Majority of the commercial data sources focused on vehicle features, new/used/CPO pricing, and vehicles listings. Such data sources lacked safety as their central focus, which is a concern for U.S. Department of Transporta ...
SBIR Phase II 2021 Department of Transportation -
Crushed Aggregate Gradation Evaluation System
SBC: OCEANIT LABORATORIES INC Topic: 20FR4Crushed aggregate is used as railroad ballast, drainage and stabilization material. Fouling of this aggregate reduces its performance: it loses its ability to drain water resulting in reduced strength. Substructure failure is a leading cause of rail accidents and it is a strategic priority to develop new methods for monitoring ballast condition. The challenge is that aggregate fouling does not pre ...
SBIR Phase II 2021 Department of Transportation