You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Optically Transparent Tapered Resistive Films
SBC: Nanovox, LLC Topic: SOCOM16004To enhance U.S. Navy operations, a technology platform will be developed for fabricating environmentally robust, visible through near-infrared (NIR) band transparent, tapered resistivity films. After refining the operational requirements and updating the device design models, a design trade study will be performed using the measured electrical (i.e., conductivity) and optical (i.e., spectral trans ...
SBIR Phase II 2022 Department of DefenseSpecial Operations Command -
Tactical Active Anti-Fogging Goggle or Spectacle
SBC: Abom, Inc. Topic: SOCOM181003Develop an innovative tactical active anti-fogging goggle or spectacle in a smaller form factor than traditional goggles.
SBIR Phase II 2020 Department of DefenseSpecial Operations Command -
Advanced Durability Systems for Unmanned Aerial Vehicle Propulsion
SBC: IBC Materials & Technologies, LLC Topic: SOCOM163002Group 2-3 UAS engines have low mean time between overhauls (MTBOs), often with as little as 200-400 hours before maintenance must be conducted.This leads to significant maintenance cost and logistics tail for deployed operations.Two-stroke piston and rotary engines for Group 2-3 platforms have common maintenance drivers such as carbon fouling, and wear of cylinders, housings and bearings.Phase I r ...
SBIR Phase II 2018 Department of DefenseSpecial Operations Command -
Tactical Active Anti-Fogging Goggle or Spectacle
SBC: Abom, Inc. Topic: SOCOM18003ABOM has developed a novel active anti-fog technology platform that has solved the problem of eyewear fogging. These fog-free and ballistics-rated polycarbonate lenses provide the individual soldier with sustained distant visual acuity and improved situational awareness. Under this proposed SBIR Phase I project, ABOM will perform evaluation and feasibility studies for four proposed Military Combat ...
SBIR Phase I 2018 Department of DefenseSpecial Operations Command -
Advanced Engine Durability Systems for Unmanned Aerial Vehicle Propulsion
SBC: IBC Materials & Technologies, LLC Topic: SOCOM163002UAV engines have a mean time between overhauls of about 400-500 hours, after which the engine is torn down for inspection. One of the primary findings during this overhaul is the presence of abundant carbon deposits in the engines and the combustion areas. There are a number of issues caused by carbon build up. When large carbon deposits are formed, they reduce the smooth air flow which can res ...
SBIR Phase I 2017 Department of DefenseSpecial Operations Command -
Transparent Tapered Resistive Elements
SBC: VOXTEL, INC. Topic: SOCOM16004A robust system level design process will be used to identify the design of transparent tapered resistive (TTR) elements, including the materials, fabrication processes, and lifecycle costs. The transparent tapered resistive film will be designed to provides a tapered resistive layer across the film while remaining transparent in the visual and near-infrared optical bands for use in radio-frequenc ...
SBIR Phase I 2016 Department of DefenseSpecial Operations Command -
Field Rail Welding with the Electroslag Welding Process
SBC: EST&D LLC Topic: 101FR5The two most frequently used field rail welding processes, thermite and flash-butt, have limitations. The thermite process, though less expensive and more portable, sometimes produces welds with inclusions which can limit short term quality and long term fatigue life. Flash-butt, which produces a very high quality weld, is not as portable as thermite. SBIR solicitation 10.1 FR5 requires a new w ...
SBIR Phase I 2010 Department of Transportation -
A Low Cost Sensor for Mid-Chord Offset Measurements
SBC: En'urga Inc. Topic: 141FR1This Phase I SBIR project will evaluate the feasibility of utilizing low cost and high accuracy local position sensors and transmitters to autonomously estimate Mid-chord offset in rails. The two innovative parts of the proposed system are (1) a set of miniature and highly accurate local position sensors and transmitters for estimating the absolute positions of the mid point and end points of a 62 ...
SBIR Phase I 2014 Department of Transportation -
Smart Pipeline Network- Cased Pipe for Monitoring and Sensor System
SBC: Odyssian Technology, L.L.C. Topic: 121PH3This PHMSA SBIR focuses on the development of a new multi-channel cased in pipe design with internal support structure that will allow access along its entire axial length while adequately securing the carrier pipe to the containment pipe. When combined with the Seal Sensor System (proposed separately), this technology will allow a Smart Pipeline Network having integrated sensor networks that pro ...
SBIR Phase I 2012 Department of Transportation -
Smart Pipeline Network- Pipe & Repair Sensor System
SBC: Odyssian Technology, L.L.C. Topic: 121PH2This PHMSA SBIR focuses on the development of a Pipe and Repair Sensor System. When combined with the Seal Sensor System (proposed separately), this technology will allow for a Smart Pipeline Network having integrated sensor networks that provide for continuous real-time monitoring of leaks and system health. In this program, smart pipes and smart composites repair having integrated leak detecti ...
SBIR Phase I 2012 Department of Transportation