List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for the given year is not complete until April of the following year. Annual Reports data is a snapshot of agency reported information for that year and hence might look different from the live data in the Awards Information charts.

  1. Foreign Like Weapon Production Capability

    SBC: McNally Industries, LLC            Topic: SOCOM172003

    The proposed Phase I effort is to complete a feasibility review of all innovative technology options that can be implemented in Phase II in order to evaluate, reverse engineer, reengineer, design, draft, fabricate, machine, coat, assemble and test facsimiles of foreign like weapons described in the topic announcement. McNally's solution is based on our years of experience in reverse engineering s ...

    SBIR Phase I 2017 Department of DefenseSpecial Operations Command
  2. Using Alternative Energy to Reduce Greenhouse Gas Production in the Transportation Sector

    SBC: ADVANCED ENGINES DEVELOPMENT CORPORATION            Topic: 142OS1

    U.S. DOT’s Zero Emissions Transportation Initiative is looking to push the transportation sector greenhouse gas production to zero by 2050. This solicitation/topic addresses alternative energy sources for the light vehicle, motorcycle, and bicycle sector. With the continuing significant development in commercialization and availability of biofuels, the possibility exists to meet this goal, with ...

    SBIR Phase I 2015 Department of Transportation
  3. Cost Effective, Power Efficient, Wireless Sensor Network Based Highway Incident Detection & Warning System

    SBC: Central Signal LLC            Topic: 07FH4

    More than 52% of U.S. urban highway congestion is a direct result of highway incidents.  Federal and State transportation authorities are searching for quick, cost-effective and efficient highway incident detection and warning systems.  Several solutions have been proposed but none could satisfy requirements of transportation authorities.  Central Signal's research and development, ...

    SBIR Phase II 2009 Department of Transportation
  4. DGPS-Based Trilateration Positioning Receiver

    SBC: Swaszek Peter            Topic: 07FH1

    Positioning and navigation have become a mainstay of everyday life in the U.S.; applications of interest include navigation of vehicles of all kinds, infrastructure mapping, and safety of life systems. Many of these recent applications have become possible through the GPS. With the recognized vulnerabilities of GPS, it is evident that equivalent backup systems must be developed. One possible so ...

    SBIR Phase I 2008 Department of Transportation
  5. Low-cost Low-power Wireless Sensor Network Based Highway Incident Detection & Warning System

    SBC: Central Signal LLC            Topic: 07FH4

    More that 52% of the U.S. highway congestion in urban areas is a direct result of highway incidents. Federal and State transportation authorities are searching for quick, low-cost and efficient highway incident detection and warning systems. Several solutions have been proposed but none could meet the requirements of transportation authorities. Central Signal, funded by federal agencies, has done ...

    SBIR Phase I 2008 Department of Transportation
  6. MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    KVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...

    SBIR Phase I 1990 Department of Transportation
  7. LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    PRESENT TRAIN DETECTION SCHEMES RELY LARGELY ON A LOW RESISTANCE THROUGH THE TRAIN'S WHEELS TO PERTURBATE A STABLE ELECTRICAL CIRCUIT. WHILE ELEGANT IN PRINCIPLE, THE DESIGN IS PLAGUED BY OXIDE FILMS AND MATERIAL BUILDUP ON THE RAIL, SNEAK PATHS THROUGH THE BALLAST AND OTHER UNCONTROLLABLE VARIABLES. KVH INDUSTRIES PROPOSES TO DESIGN AND DELIVER A "SMART MAGNETOMETER"-BASED SENSOR PACKAGE WHICH WI ...

    SBIR Phase II 1995 Department of Transportation
  8. LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of Transportation
  9. MULTICHAIN LORAN-C TIME DIFFERENCE MONITOR RECEIVER

    SBC: LOCUS, INC.            Topic: N/A

    USCG SOLICITATION 90-CG5 SUGGESTS EVALUATION OF KALMAN FILTERING A DIGITAL SIGNAL PROCESSING (DSP) TECHNIQUE, TO IMPROVE GEODETIC POSITIONING PROVIDED BY SINGLE CHAIN, AND EVENTUALLY, MULTICHAIN LORAN RECEIVERS. A DSP TECHNIQUE COMPARABLE TO KALMAN FILTERING HAS ALREADY BEEN IMPLEMENTED ON A SINGLE CHAIN LORAN RECEIVER, RESULTING IN SUBSTANTIAL GEODETIC POSITIONING IMPROVEMENTS IN NOISY, DYNAMIC E ...

    SBIR Phase II 1991 Department of Transportation
  10. MULTICHAIN LORAN-C TIME DIFFERENCE MONITOR RECEIVER

    SBC: LOCUS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government