You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Compliant Brush Shroud Casing Development for Aircraft Engine Compressors

    SBC: ADVANCED COMPONENTS & MATERIALS, INC.            Topic: N/A

    The proposed Phase II program will optimize the design and manufacturing process of a compliant brush shroud casing. Recent tests at Wright Laboratories with staged brush seals have demonstrated significantly increased blade to shroud rub tolerance of acompliant casing. Phase I of the program is expected to demonstrate the feasibility of two innovative brush shroud designs with lower cost and we ...

    SBIR Phase I 2001 Department of DefenseAir Force
  2. Compliant Brush Shroud Casing Development for Aircraft Engine Compressors

    SBC: ADVANCED COMPONENTS & MATERIALS, INC.            Topic: N/A

    The proposed Phase II program will optimize the design and manufacturing process of a compliant brush shroud casing. Recent tests at Wright Laboratories with staged brush seals have demonstrated significantly increased blade to shroud rub tolerance of acompliant casing. Phase I of the program is expected to demonstrate the feasibility of two innovative brush shroud designs with lower cost and we ...

    SBIR Phase II 2001 Department of DefenseAir Force
US Flag An Official Website of the United States Government