You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SYSTEM FOR ECONOMICALLY PRODUCING MARGINAL DEEPWATER GAS DISCOVERIES

    SBC: Atlantia Energy Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  2. BOREHOLE PIEZOELECTRIC SOURCE FOR HIGH RESOLUTION SEISMIC APPLICATIONS

    SBC: High Resolution Seismics Inc            Topic: N/A

    THE U.S. HAS AN ESTIMATED 327 BILLION BARRELS OF OIL IN EXISTING PRODUCTION FIELDS WHICH REMAINS IN PLACE EVEN AFTERPRIMARY AND SECONDARY RECOVERY TECHNIQUES HAVE BEEN EMPLOYED. HIGH RESOLUTION BOREHOLE-TO-BOREHOLE SEISMIC TOMOGRAPHY CAN PROVIDE THE INFORMATION NEEDED TO LOCATE THESE UNPRODUCED REGIONS THROUGH THE IDENTIFICATION OF SUBTLE GEOLOGIC ANOMALIES AND CAN BE USED TO ASSESS THE PROGRESS O ...

    SBIR Phase I 1990 Department of Energy
  3. APPLICATION SPECIFIC, DISCRETE JUNCTION FET DESIGNED FOR USEIN LARGE PARTICLE DETECTOR PREAMPLIFIER CIRCUITRY

    SBC: Interfet Corp            Topic: N/A

    IMPROVED ELECTRONICS IN THE PREAMPLIFIER CIRCUIT OF CALORIMETER DETECTORS IS DESIRED TO IMPROVE THE ABILITY TO COLLECT DATA FROM HIGH ENERGY ACCELERATORS FOR PHYSICS EXPERIMENTS. EXTREMELY LOW NOISE AMPLIFICATION IS REQUIRED TO AVOID POOR SIGNAL TO NOISE RATIOS SINCE ANALOG SUMS OF ALL THE DETECTOR SIGNALS ARE PERFORMED FOR TRIGGER PURPOSES. FAST SIGNAL PROCESSING SPEED IMPOSED BY THE EVENT RATES ...

    SBIR Phase I 1990 Department of Energy
  4. ULTRA-HIGH-SPEED CHROMATOGRAPHY FOR MONITORING PHOTOCHEMICALDETOXIFICATION OF HAZARDOUS WASTES

    SBC: Ionics International, Inc.            Topic: N/A

    A MAJOR PROBLEM ASSOCIATED WITH THE USE OF ULTRA-HIGH-RESOLUTION GAS CHROMATOGRAPHY FOR EFFLUENT MONITORING IS THE RELATIVELY LOW SPEED OF ANALYSIS. WE PROPOSE TO DEVELOP AN ULTRA-HIGH-SPEED CAPILLARY GAS CHROMATOGRAPH WHICH WOULD BE SUITABLE FOR THE ANALYSIS OF EFFLUENT SAMPLES IN JUST A FEW SECONDS. THE HEART OF THE NEW INSTRUMENT WOULD BE A MICROBORE COLUMN WITH AN INTERNAL DIAMETER OF 50 MUM O ...

    SBIR Phase I 1990 Department of Energy
  5. A TECHNIQUE FOR MEASURING DIFFUSION OF HYDROGEN ISOTOPES IN OXIDES

    SBC: IONWERKS INC            Topic: N/A

    SURFACE METAL OXIDE AND OXYHYDROXIDE LAYERS HAVE BEEN IMPLICATED AS TRITIUM TRAPS IN STAINLESS STEELS. A NEW TECHNIQUE IS BEING DEVELOPED FOR MEASURING HYDROGEN ISOTOPE DIFFUSION WITHIN THIS LAYER AND WITHIN PERMEATION BARRIERS MEANT TO LIMIT TRITIUM INVENTORY IN THESE MATERIALS.

    SBIR Phase I 1990 Department of Energy
  6. APPLICATION OF NEURAL NETWORKS FOR AUTOMATED INSPECTION OF NUCLEAR POWER PLANT PIPING

    SBC: KARTA TECHNOLOGIES            Topic: N/A

    THE INSPECTION OF BUTT-WELDED STAINLESS STEEL PIPE JOINTS IN NUCLEAR POWERPLANTS IS ROUTINELY PERFORMED USING ULTRASONIC NON-DESTRUCTIVE EVALUATION METHODS. FIELD EXPERIENCE, BASED ON CONVENTIONAL ULTRASONIC SIGNAL AMPLITUDE CRITERIA, SHOWS THAT A LARGE NUMBER OF INDICATIONSARE RECORDED. MOST OF THESE ARE NOT CAUSED BY CRACKS, BUT THE WELD GEOMETRY AND IMPEDANCE MISMATCH BETWEEN THE WELD AND THE B ...

    SBIR Phase II 1990 Department of Energy
  7. ROBOTIC WALL SCRUBBER FOR NUCLEAR REACTOR WELLS AND FUEL STORAGE POOLS

    SBC: KARTA TECHNOLOGIES            Topic: N/A

    DURING THE REFUELING OPERATIONS AT A NUCLEAR POWER PLANT, IT IS NECESSARY TO FLOOD LARGE CAVITIES ABOVE THE REACTOR PRESSURE VESSEL WITH WATER TO PROVIDE RADIATION SHIELDING. THE SPENT FUEL IS TRANSPORTED THROUGH THESE CAVITIES TO A TEMPORARY STORAGE POOL LOCATED NEAR THE REACTOR. OTHER CONTAMINATED INTERNAL REACTOR COMPONENTS ARE ALSO STORED WITHIN THESE CAVITIES DURING REFUELING. ONCE THE REFUEL ...

    SBIR Phase I 1990 Department of Energy
  8. MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    KVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...

    SBIR Phase I 1990 Department of Transportation
  9. INTELLIGENT LOAD CONTROL USING AN EXPERT SYSTEM

    SBC: Micon Engineering            Topic: N/A

    THE PURPOSE OF THIS PROJECT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING AN INTELLIGENT CUSTOMER LOAD CONTROLLER IMPLEMENTED WITH AN EXPERT SYSTEM. CONVENTIONAL ELECTRICAL LOAD CONTROL DEVICES IMPLEMENT CONTROLLING FUNCTIONS BASED ON PREDETERMINED ALGORITHMS WHICH MAKE ASSUMPTIONS ABOUT TYPICAL USE PATTERNS. USE OF AN EXPERT SYSTEM WITH A LEARNING ALGORITHM IN A LOAD CONTROLLER WOULD PERMIT THE C ...

    SBIR Phase I 1990 Department of Energy
  10. THREE DIMENSIONAL BRAIDING TECHNOLOGY FOR PREFORM FABRICATION OF STRUCTURAL CERAMIC COMPOSITE SHAPES FOR FOSSIL ENERGY

    SBC: Quadrax Advanced Materials            Topic: N/A

    PHASE I AIMS TO DEMONSTRATE THE FEASIBILITY OF FABRICATING PREFORMS FOR CERAMIC COMPOSITE SHAPES OF INTEREST TO FOSSIL ENERGY BY USING PROPRIETARY THREE-DIMENSIONAL BRAIDING TECHNOLOGY. HIGH PERFORMANCE CERAMIC COMPOSITES, OPERATING IN EXTREME CONDITIONS OF TEMPERATURE AND CORROSIVE ENVIRONMENT, REQUIRE PREFORM ARCHITECTURES THAT CAN PROVIDE TOUGHNESS, STRENGTH, AND A CAPACITY TO ELIMINATE FAILURE ...

    SBIR Phase II 1990 Department of Energy
US Flag An Official Website of the United States Government