You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. CONFORMAL MAGNETIC REPAIR SYSTEM

    SBC: Electroimpact, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  2. DEVELOPMENT OF A LIGHTWEIGHT QUIET POWER SOURCE

    SBC: INFINIA CORPORATION            Topic: N/A

    STIRLING TECHNOLOGY COMPANY (STC) WILL DEVELOP AND TEST A LONG LIFE, HIGH EFFICIENCY, LOW VIBRATION, HIGH POWER DENSITY STIRLING CYCLE ENGINE SYSTEM TO SERVE AS A POWER SOURCE FOR A MICROCLIMATE COOLING BACKPACK. THE KEY OBJECTIVES FOR THE SYSTEM ARE HIGH EFFICIENCY, HIGH POWER DENSITY OF THE MACHINE, SUITABILITY AS A PERSONAL BACKPACK UNIT AND LONG LIFE. HIGH EFFICIENCY WILL RESULT FROM A STIRLIN ...

    SBIR Phase I 1990 Department of DefenseArmy
  3. MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    KVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...

    SBIR Phase I 1990 Department of Transportation
  4. GPS COMPATIBLE AUTOMATIC CALIBRATION COMBAT VEHICLE DIGITAL COMPASS

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  5. DEVELOPMENT OF A HEAT PIPE THERMAL MANIKIN WITH AN IRRIGATED SKIN

    SBC: Measurement Technologies            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  6. CHEMOTHERAPY OF LEISHMANIA WITH OLIQODEOXYNUCLEOTIDE PROBES

    SBC: Epoch Pharmaceuticals, Inc.            Topic: N/A

    WE WILL INVESTIGATE THE ABILITY OF OLIGODEOXYNUCLEOTIDES COMPLEMENTARY TO THE SPLICED LEADER SEQUENCE OF LEISHMANIA ENRIETTII TUBULIN MRNA'S TO INHIT TRANSLATION AND TO KILL THE CELLS IN CULTURE. VARIOUS CHEMICAL MODIFICATIONS WILL BE MADE TO ENHANCE THE EFFECT OF THE OLIGOS. SUCCESSFUL AGENTS MAY BE VALUABLE, SELECTIVE CHEMOTHERAPEUTIC AGENTS AGAINST OTHER LEISHMANIA SPECIES IF MAD COMPLEMENTARY ...

    SBIR Phase II 1990 Department of DefenseArmy
  7. AN IMPROVED FUSIBLE LINK FOR FASCAM MINES

    SBC: Silicon Designs, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  8. PROCESS IMPROVEMENT TOOL FOR SOFTWARE DEVELOPMENT

    SBC: Software Consultants Internati            Topic: N/A

    ATOOL IS PROPOSED WHICH WILL IMPROVE THE EFFICIENCY AND EFFECTIVENESS OF THE DEFECT AND ERROR CORRECTION CAPABILITY OF SOFTWARE DEVELOPERS. THIS TOOL WILL INCORPORATE SEVERAL OF THE LATEST CONCEPTS IN SOFTWARE ENGINEERING INCLUDING OBJECT ORIENTED ANALYSIS, EXPERT SYSTEMS AND CASE ENVIRONMENTS. THIS PHASE I EFFORT IS DIRECTED AT IDENTIFYING WHAT DATA, PARAMETERS, AND RELATIONSHIPS MUST BE IDENTIFI ...

    SBIR Phase I 1990 Department of DefenseArmy
  9. A HIGH SPEED SOLDER PASTE PRINTER FOR SURFACE MOUNT APPLICATIONS

    SBC: Waterjet Technology Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
US Flag An Official Website of the United States Government