You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. RIBBONIZED ORGANIZED INTEGRATED (ROI) ELECTRICAL

    SBC: Arrowsmith Shelburne, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseNavy
  2. IMPROVED DGPS DATA RELIABILITY THROUGH THE USE OF ADVANCED SIGNAL PROCESSING TECHNIQUES

    SBC: CAMBRIDGE ENGINEERING, Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  3. STANDARDIZED INTERACTIVE ELECTRONIC PRESENTATION OF WEAPON SYSTEM TROUBLESHOOTING

    SBC: Hyper-view Systems Corp            Topic: N/A

    THIS PROPOSAL IDENTIFIES A STRATEGY, BASED ON NEW OFF-THE-SHELF TOOLS, PROTOTYPING, AND INTERACTION WITH MAINTENANCE PERSONNEL, FOR DEVELOPING INFORMATION PRESENTATION GUIDELINES WHICH SUPPORT MAINTENANCE PERSONNEL WITH VARIOUS EXPERIENCE LEVELS, THE ENVIRONMENTS IN WHICH THE MAINTENANCE IS PERFORMED, THE DIFFERENT MEDIA AVAILABLE FOR ONLINE INFORMATION DISPLAY, AND THE COST-EFFECTIVE OF IMPLEMENT ...

    SBIR Phase I 1990 Department of DefenseNavy
  4. MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    KVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...

    SBIR Phase I 1990 Department of Transportation
  5. STUDY AND EVALUATION OF FIBER REINFORCED DOWELL BARS FOR USEIN HIGHWAYS

    SBC: Etc Engineers Inc.            Topic: N/A

    DOWEL BARS HAVE TRADITIONALLY BEEN USED AS AN IMPORTANT LOADTRANSFER MECHANISM ON OUR FEDERAL HIGHWAYS. A SIGNIFICANT PROBLEM OCCURRS WITH THE USE OF THESE BARS DUE TO RUST AND RESULTANT SPALLING AND CRACKING CONCRETE. COMPOSITE REINFORCING BARS (CRB) HAVE BECOME WIDELY USED FOR CRACK CONTROL IN MANY REINFORCED CONCRETE STRUCTURES EXPOSED TO AGGRESSIVE ENVIRONMENTS. A LIMITED AMOUNT OF DATA IS AVA ...

    SBIR Phase II 1990 Department of Transportation
US Flag An Official Website of the United States Government