You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS
SBC: KVH INDUSTRIES, INC. Topic: N/AKVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...
SBIR Phase I 1990 Department of Transportation -
LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING
SBC: KVH INDUSTRIES, INC. Topic: N/AN/A
SBIR Phase I 1993 Department of Transportation -
IMPROVED AEROSOL CAN
SBC: Materials Engineering & Topic: N/AN/A
SBIR Phase I 1990 Department of Transportation -
TRIP GENERATION SOFTWARE FOR NOTEBOOK COMPUTERS: A FEASIBILITY STUDY
SBC: Unison Consulting Group Inc. Topic: N/ATHE FEASIBILITY STUDY WILL BE IN EIGHT ELEMENTS WITH ELEMENT 1 BEING AN ANALYSIS OF CURRENT TRANSPORTATON PLANNING AND ENGINEERING SOFTWARE AND HARDWARE USE. DESIGN-COMPUTERS WILL BE IDENTIFIED IN THIS ELEMENT. IN ELEMENT 2, AN ANALYSIS OF DATA INPUT OPTIONS AND THEIR IMPLICATIONS FOR THE SOFTWARE AND DESIGN-COMPUTER HARDWARE IDENTIFIED WILL BE COMPLETED. THE REQUIREMENTS TO ACCOMODATE AUTOMATIC V ...
SBIR Phase I 1993 Department of Transportation -
COMPUTER-BASED PAVEMENT DISTRESS IDENTIFICATION SYSTEM
SBC: Eres Consultants Inc. Topic: N/AN/A
SBIR Phase I 1993 Department of Transportation