You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    KVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...

    SBIR Phase I 1990 Department of Transportation
  2. LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of Transportation
  3. IMPROVED AEROSOL CAN

    SBC: Materials Engineering &            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  4. TRIP GENERATION SOFTWARE FOR NOTEBOOK COMPUTERS: A FEASIBILITY STUDY

    SBC: Unison Consulting Group Inc.            Topic: N/A

    THE FEASIBILITY STUDY WILL BE IN EIGHT ELEMENTS WITH ELEMENT 1 BEING AN ANALYSIS OF CURRENT TRANSPORTATON PLANNING AND ENGINEERING SOFTWARE AND HARDWARE USE. DESIGN-COMPUTERS WILL BE IDENTIFIED IN THIS ELEMENT. IN ELEMENT 2, AN ANALYSIS OF DATA INPUT OPTIONS AND THEIR IMPLICATIONS FOR THE SOFTWARE AND DESIGN-COMPUTER HARDWARE IDENTIFIED WILL BE COMPLETED. THE REQUIREMENTS TO ACCOMODATE AUTOMATIC V ...

    SBIR Phase I 1993 Department of Transportation
  5. COMPUTER-BASED PAVEMENT DISTRESS IDENTIFICATION SYSTEM

    SBC: Eres Consultants Inc.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of Transportation
US Flag An Official Website of the United States Government