You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Composite, Stuff-Proof Windshield and Lightweight Pilothouse Assembly
SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME Topic: N/AIn this Phase I SBIR Program, K+P Agile will develop a high strength, lightweight, modular, composite windshield structure for the MK V Special Operations Craft (SOC) that will not fail when the craft passes through a wave (or
SBIR Phase I 2001 Department of DefenseSpecial Operations Command -
MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS
SBC: KVH INDUSTRIES, INC. Topic: N/AKVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...
SBIR Phase I 1990 Department of Transportation -
IMPROVED AEROSOL CAN
SBC: Materials Engineering & Topic: N/AN/A
SBIR Phase I 1990 Department of Transportation -
N/A
SBC: Sharma & Associates, Inc. Topic: N/AThere is a growing trend towards the use of ¿Car-Less¿ technology, where a rail-car is not needed to transport road-haul trailers over rail: Trailers operate in the usual manner over highways, drive up to a rail yard and transform to ¿rail-mode¿ with relative ease. In rail mode, many ¿Car-Less¿ units use slightly modified 3-piece, 70-ton freight car trucks. These trucks are no ...
SBIR Phase I 2001 Department of Transportation