You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Unipolar nBn HgCdTe on Silicon for High Performance, Low Cost NIR/SWIR Imagers
SBC: EPIR TECHNOLOGIES INC Topic: SOCOM12002We propose the development of a near infrared/shortwave infrared (NIR/SWIR) sensor based on mercury cadmium telluride (HgCdTe) in an n-type/barrier/n-type (nBn) architecture, designed for room-temperature operation in the 0.7 to 2.8µm NIR/SWIR spectral range. The sensor will compete as a low cost/high performance alternative to near infrared indium gallium arsenide (InGaAs)-based cameras by prov ...
SBIR Phase I 2012 Department of DefenseSpecial Operations Command -
Electronically Controlled Pneumatic Brake System Emulator Development
SBC: Sharma & Associates, Inc. Topic: 121FR2Migration of the vehicle fleet from the current, pneumatic-only, automatic air brake (AAB) system to ECP presents a significant challenge due to the systems’ inherent operational incompatibility. This project will investigate the feasibility of devices that can help to ease this transition by allowing ECP equipped cars to operate in a conventionally braked train, as well as devices to permit con ...
SBIR Phase I 2012 Department of Transportation -
MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS
SBC: KVH INDUSTRIES, INC. Topic: N/AKVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...
SBIR Phase I 1990 Department of Transportation -
IMPROVED AEROSOL CAN
SBC: Materials Engineering & Topic: N/AN/A
SBIR Phase I 1990 Department of Transportation