You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Artificial Intelligence for Monitoring Crossing Infrastructure and to Improve Grade Crossing Safety

    SBC: WI-TRONIX, LLC            Topic: 20FR2

    Founded in 2004, the mission of Wi-Tronix is to improve railway safety, operational efficiency, and service reliability, in real-time. We are the preferred connected solutions provider to over one-third of all locomotives in North America. Wi-Tronix is proposing to leverage our expertise in developing and making commercially available AI based technologies for autonomous highway-rail grade crossin ...

    SBIR Phase I 2020 Department of Transportation
  2. DeepCTIS: A New Low-Cost Hyperspectrual Imaging Module and Distributed Deep Learning Platform to Combat Illegal, Unreported, and Unregulated Fishing in the Marketplace at Scale

    SBC: SYNTHETIK APPLIED TECHNOLOGIES LLC            Topic: 9202

    We propose an innovative yet straightforward approach to developing and delivering a readily deployable product to support combating IUU. We combine newly available low-cost hyperspectral sensors with state-of-the-art deep learning-based real-time data processing and deploy it on high-availability commodity cloud computing hardware - our solution is compatible with both existing systems as well as ...

    SBIR Phase I 2020 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Improved Condition Monitoring of Traction Motors

    SBC: Sharma & Associates, Inc.            Topic: 190FR5

    Identification of defects and incipient failures before the breakdown of the equipment is recognized as an important maintenance activity in the railroad industry to improve efficiency and safety of the operation. It is well known that a proper implementation of condition monitoring improves the overall equipment reliability and reduces unexpected field failures. Traction motor faults can result i ...

    SBIR Phase I 2020 Department of Transportation
  4. MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    KVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...

    SBIR Phase I 1990 Department of Transportation
  5. IMPROVED AEROSOL CAN

    SBC: Materials Engineering &            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
US Flag An Official Website of the United States Government