You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ANALYSIS OF METHODS FOR MANUFACTURING OPTICALLY TRANSPARENT TAPEREDRESISTIVE FILMS

    SBC: NANOSONIC INC.            Topic: SOCOM16004

    Optically transparent resistive films with sheet resistivity that varies from that of metals to that of free space would be useful to soften the detected edges of objects and make them less susceptible to detection and identification by RF targeting systems.The objective of this program is to complete a survey of manufacturing methods that could be used to manufacture such a tapered resistance fil ...

    SBIR Phase I 2016 Department of DefenseSpecial Operations Command
  2. A Mobile and Social Approach to Fostering Casual Carpooling in New Corridors

    SBC: APPLIED ENGINEERING MANAGEMENT CORPORATION            Topic: 161FH1

    The technical objective of this Phase I project is to develop concept that demonstrates the viability of one or more tools and/or approaches to catalyze casual carpooling in a corridor where it does not exist or to improve casual carpooling in a corridor where it is present but underperforming. The proposed approach offers four unique components: (1) building off of the existing casual carpoolin ...

    SBIR Phase I 2016 Department of Transportation
  3. Pedestrian and Cyclist Detection Devices for Transit Buses

    SBC: NOVATEUR RESEARCH SOLUTIONS LLC            Topic: 161FT1

    This SBIR proposal presents a robust and cost-effective pedestrian and cyclist detection and collision warning system for transit buses. It uses inexpensive but robust sensors and incorporates state-of-the-art object detection techniques to enable effective pedestrian and cyclist detection near transit buses in different environmental conditions. The proposed collision warning system exploits meas ...

    SBIR Phase I 2016 Department of Transportation
  4. Simulating Signal Phase and Timing with an Intersection Collision Avoidance Traffic Model

    SBC: HARMONIA HOLDINGS GROUP, LLC            Topic: 101FH3

    eTEXAS is an integrated traffic and communications simulator developed in cooperation with the US Department of Transportation (USDOT) to support the development of Connected Vehicle (CV) Apps and to perform research on vehicle and roadside Dedicated Short-Range Communication/Wireless Access in Vehicular Environments (DSRC/WAVE) communications using the Society of Automotive Engineers (SAE) standa ...

    SBIR Phase II 2016 Department of Transportation
  5. THE RESEARCH INVESTIGATOR'S TECHNOLOGY SYSTEM "RITA"

    SBC: Intellicorp            Topic: N/A

    COORDINATING INFORMATION EXCHANGE BETWEEN A LARGE NUMBER OF INTERRELATED RESEARCH AND DEVELOPMENT (R&D) PROJECTS HAS TYPICALLY BEEN CONDUCTED USING HIERARCHICAL DATA BASE MANAGEMENT SOFTWARE FOR CATALOGING AND RETRIEVING PROJECT RECORDS. AN INTELLIGENT R&D INVESTIGATOR'S ASSISTANT, ONE THAT USED OBJECT-ORIENTED PROGRAMMING TECHNIQUES TO CLASSIFYPROJECTS AND THAT COULD EMPLOY SUBJECTIVE KNOWLEDGE A ...

    SBIR Phase I 1990 Department of Transportation
  6. MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    KVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...

    SBIR Phase I 1990 Department of Transportation
  7. LASER RADAR MEASUREMENT SYSTEM FOR ROADSIDE ENCROACHMENT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
US Flag An Official Website of the United States Government