You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Acoustic Mouthpiece Skullborne Audio Information System for the Rebreather
SBC: ANALYTICAL ENGINEERING INC Topic: N/AThe successful development of an acoustic mouthpiece based audio in formation system for rebreathing apparatus will revolutionize military, professional, and recreational diving. The system proposed provides the diver with voice and tonal audio imformation regarding depth, bottom time, tank pressure, gas mixture data, time, temperature, and any other critical information which is available from ...
SBIR Phase I 1997 Department of DefenseSpecial Operations Command -
Helmsman's Recording Accelerometer (HRA)
SBC: Applied Measurement Systems, Topic: N/ASpecial Operations Forces (SOF) require a real time display of appr opriate data to allow the helmsman to access the damage potential to his cargo (equipment/personnel) and support his decision relative to speed and course selection when operating in rough water. Furthermore, maintenance support personnel need quantitative data to support design decisions and maintenance activities. This proposa ...
SBIR Phase I 1997 Department of DefenseSpecial Operations Command -
MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS
SBC: KVH INDUSTRIES, INC. Topic: N/AKVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...
SBIR Phase I 1990 Department of Transportation -
Advanced Sound Deterrent Methodology for Wildlife
SBC: Two Way Service & Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation