You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
LF DETECTION OF AIRCRAFT
SBC: DEEGAN RESEARCH GROUP, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency -
STANDARDIZED INTERACTIVE ELECTRONIC PRESENTATION OF WEAPON SYSTEM TROUBLESHOOTING
SBC: Hyper-view Systems Corp Topic: N/ATHIS PROPOSAL IDENTIFIES A STRATEGY, BASED ON NEW OFF-THE-SHELF TOOLS, PROTOTYPING, AND INTERACTION WITH MAINTENANCE PERSONNEL, FOR DEVELOPING INFORMATION PRESENTATION GUIDELINES WHICH SUPPORT MAINTENANCE PERSONNEL WITH VARIOUS EXPERIENCE LEVELS, THE ENVIRONMENTS IN WHICH THE MAINTENANCE IS PERFORMED, THE DIFFERENT MEDIA AVAILABLE FOR ONLINE INFORMATION DISPLAY, AND THE COST-EFFECTIVE OF IMPLEMENT ...
SBIR Phase I 1990 Department of DefenseNavy -
MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS
SBC: KVH INDUSTRIES, INC. Topic: N/AKVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...
SBIR Phase I 1990 Department of Transportation -
GPS COMPATIBLE AUTOMATIC CALIBRATION COMBAT VEHICLE DIGITAL COMPASS
SBC: KVH INDUSTRIES, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseArmy -
NON-ORTHOGONAL WAVELET EXPANSIONS AND THEIR APPLICATIONS
SBC: PROMETHEUS INC. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency -
Undersea Acoustic Risk Analysis Decision Aid for Theater Anti-Submarine Warfare (TASW) Mission Planning
SBC: MARINE ACOUSTICS INC Topic: N192117In a high op-tempo, multi-threat environment within the Theatre Anti-Submarine Warfare (TASW) Watchfloor, the Planners, usually the Future Ops (FUOPS) cell, requires an assessment of the risk to future TASW operations based on the assessed threat according to the Most Likely/Most Dangerous Course Of Actions (MLCOA/MDCOAS) of OPFOR forces.TASW Planners require Risk Analysis Mission Planning capabil ...
SBIR Phase I 2020 Department of DefenseNavy -
Low Distortion Repair of Thin Superalloy Components
SBC: VRC Metal Systems, LLC Topic: AF191100Thin walled nickel alloys in exhaust sections of USAF propulsion systems are prone to cracking. Traditional repairs result in distortion and require post heat treatment. Needed is a method of repair that eliminates distortion and is mechanically, microstructurally, and chemically stable in engine exhaust environments. VRC Metal Systems (VRC) and the South Dakota School of Mines and Technology (SDS ...
SBIR Phase I 2020 Department of DefenseAir Force -
Torpedo Advanced Processor Build (APB) Algorithm Development
SBC: MIKEL INC Topic: N192121The current U.S. Navy heavy-weight torpedo (HWT) is a complex autonomous system that carries out several autonomous phases after being launched from a U.S. Navy asset platform. These phases, as mentioned in the solicitation, are generally search, detect, track, classify, localize, home, and prosecute. Owing largely to the complexities of the underwater acoustic environment, the HWT must operate wi ...
SBIR Phase I 2020 Department of DefenseNavy -
Testing and Inspection of Interface Corrosion of the DBX-1 and MIC Primer Components and Ammunition Housings
SBC: INNOVATIVE MATERIALS & PROCESSES INC Topic: A19111Development of new lead-free replacements for lead styphnate and lead azide-based munition formulations made necessary to re-examine possible compatibility problems with current and future materials used for selecting adequate ammunition housings. Moreover, the compatibility/corrosion problems could be inherently associated with processing technology and therefore this aspect should be addressed b ...
SBIR Phase I 2020 Department of DefenseArmy -
(5) NAVY TECHNOLOGY ACCELERATION- Unmanned Surface Vehicle (USV) and Unmanned Underwater Vehicle (UUV) Autonomous Behavior Development
SBC: SEACORP, LLC Topic: N193A02The Navy has identified a need for improvements to autonomous behavior of Unmanned Surface Vehicles (USV) and Unmanned Underwater Vehicles (UUV), specifically in the Focus Area of classification of encountered surface and subsurface vessels. System Engineering Associates Corporation (SEA CORP) proposes a tailored application of the latest developments in Electronic Warfare (EW) system design to me ...
SBIR Phase I 2020 Department of DefenseNavy