You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Environmentally Friendly Low Friction Coating for Concrete Barriers
SBC: RESODYN CORPORATION Topic: 121FH1Resodyn Corporation is proposing a material and application system that will create a low friction coating on concrete median barriers. The advanced material developed for the low friction coating is an affordable, tough, weather resistant, and environmentally friendly copolymer. The proposed application concept is for truck mounted equipment that enables a single pass application of the coating ...
SBIR Phase I 2012 Department of Transportation -
DGPS-Based Trilateration Positioning Receiver
SBC: Swaszek Peter Topic: 07FH1Positioning and navigation have become a mainstay of everyday life in the U.S.; applications of interest include navigation of vehicles of all kinds, infrastructure mapping, and safety of life systems. Many of these recent applications have become possible through the GPS. With the recognized vulnerabilities of GPS, it is evident that equivalent backup systems must be developed. One possible so ...
SBIR Phase I 2008 Department of Transportation -
Helmsman's Recording Accelerometer (HRA)
SBC: Applied Measurement Systems, Topic: N/ASpecial Operations Forces (SOF) require a real time display of appr opriate data to allow the helmsman to access the damage potential to his cargo (equipment/personnel) and support his decision relative to speed and course selection when operating in rough water. Furthermore, maintenance support personnel need quantitative data to support design decisions and maintenance activities. This proposa ...
SBIR Phase I 1997 Department of DefenseSpecial Operations Command -
RESEARCH AND DEVELOPMENT OF AUDIO, VISUAL AND PRINTED MATERIALS FOR EMS PERSONNEL
SBC: Association Management & Cons. Topic: N/AN/A
SBIR Phase I 1986 Department of Transportation -
EcoSod: An Alternative Native Sod Solution for Highway Construction Projects
SBC: Bitterroot Restoration Inc. Topic: N/AThe Surface Transporation and Uniform Relocation Assistance Act (STURAA) requires the use of native grasses and wildflowers within highway corridors. A major problem for the revegetation industry has been the ability to predictably establish native vegetation from seed. The production of native sods would allow for the most sensitive period of establishment-germination and initial seedling growt ...
SBIR Phase I 2003 Department of Transportation -
MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS
SBC: KVH INDUSTRIES, INC. Topic: N/AKVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...
SBIR Phase I 1990 Department of Transportation -
LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING
SBC: KVH INDUSTRIES, INC. Topic: N/AN/A
SBIR Phase I 1993 Department of Transportation -
OCEAN WAVE ENERGY CONVERTER
SBC: Ocean Wave Energy Co Topic: N/AMAJOR AIDS TO NAVIGATION (ATON) ARE ESSENTIAL SIGNPOSTS FOR SAFE PASSAGE ALONG COASTAL AND OFFSHORE SEAWAYS. PRESENTLY, THEIR SIGNALS ARE POWERED BY ON-SITE ENGINE GENERATORS REQUIRING CONSIDERABLE AND COSTLY MAINTENANCE. ATON AUTONOMY WILL BE GREATLY INCREASED WITH DEEP DISCHARGE BATTERY TECHNOLOGY PROVIDING THAT ON-SITE CHARGING SOURCES ARE USED. AMONG NATURALLY AVAILABLE SOURCES, THE UNCEASING ...
SBIR Phase I 1989 Department of Transportation -
An Inexpensive Structural Core Material for Composite Bridges
SBC: Polymer Bridge Systems, Inc. Topic: N/APolymer Bridge Systems, with over 8 years of research composite bridges, found that success hinges on being dollar-for-dollar cost competitive with steel and concrete. We founded the four "golden rules" that are required: the bridge must be: 1) factory build; 2) road transportable; 3) installed in 1 eight-hour day; and 4) be cost-competitive on an installed cost basis. This bridge will be buil ...
SBIR Phase I 1996 Department of Transportation -
Special Operations Forces Combatant Motion Recording and Biofeedback
SBC: MEMSense, LLC Topic: N/A"Qualvox's FreeMotion Trainer will integrate advances in accelerometers, magneto-resistive sensors, rechargeable battery technology, low-power processors, and high-density memory devices roviding a motion analysis system with superior performance,reliability and usefulness. The system will consist of: sixteen sensor modules located on target body segments and one processor board all packaged in a ...
SBIR Phase I 2002 Department of DefenseSpecial Operations Command