You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Edge AI Enabled Detection & Autonomous Tracking of Vehicles from a Rucksack Portable Fixed-Wing sUAS

    SBC: WINGXPAND INC.            Topic: A234007

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  2. 3D Woven Composite Mortar Baseplate

    SBC: T.E.A.M., INC.            Topic: A214006

    Redacted

    SBIR Phase I 2021 Department of DefenseArmy
  3. Next Generation Field Computing Device-Wearable

    SBC: STAUDER CONSULTING, INC.            Topic: SOCOM211D005

    Stauder Technologies is proposing to design and develop a next generation Field Computing Device – Wearable (FCD-W) kit solution. The kit will include a Smart Hub with the ability to create a secure wired or optional wireless connection to any End User Device (EUD). The Smart Hub will provide on board processing with advanced automatic data management and routing to ease operator burden. There w ...

    SBIR Phase II 2021 Department of DefenseSpecial Operations Command
  4. Rapid Terrain/Map Generation for Robotic and Autonomous Vehicle Simulations

    SBC: LICKENBROCK TECHNOLOGIES, INC.            Topic: A20129

    The objective of this project is to build 3D terrain models from satellite imagery and Digital Elevation Maps (DEM) using the Unreal Engine platform. Terrain and other objects are added to the 3D model by classifying objects from RGB satellite images. The classification of objects is typically the most time-consuming step within the entire process, which is currently done manually by a user. In P ...

    SBIR Phase I 2021 Department of DefenseArmy
  5. Non-Explosive Non Nuclear Electro-Magnetic Pulse (EMP) Power Supply

    SBC: LOKI INC            Topic: A19081

    The objective of this Phase II effort is to create new single use power supplies as the prime electrical sources for radio frequency transmitters installed in guided multiple launch rocket systems or 155 mm rounds, per the A19-081 Topic description. These power supplies may be reused if required. According to the Topic, in the Phase II program the power supply: Is to produce 500 kV of output volta ...

    SBIR Phase II 2020 Department of DefenseArmy
  6. Pose-Invariant Probabilistic Face Recognition

    SBC: VISION SYSTEMS INC            Topic: A20074

    Modern deep learning-based face recognition systems perform at or above human levels on high quality frontal imagery, but their performance suffers significantly on more operationally relevant imagery with confounding factors such as extreme pose.  This performance degradation is based on two primary shortcomings: poor match between training and test-time image data, and failure to model inherent ...

    SBIR Phase I 2020 Department of DefenseArmy
  7. Compact Thermal Solutions through Additive Manufacturing Techniques

    SBC: THERMAVANT TECHNOLOGIES LLC            Topic: A20007

    Under this proposed Phase I SBIR effort, ThermAvant Technologies (ThermAvant) shall design, model, prototype and analyze the thermal performance of landscaped heat sinks with integral oscillating heat pipes (OHP) and phase change material (PCM) reservoirs (collectively, OHP/PCM). Prototype OPH/PCM heat sinks shall demonstrate their unique potential to acquire, rapidly spread and isothermally store ...

    SBIR Phase I 2020 Department of DefenseArmy
  8. Testing and Inspection of Interface Corrosion of the DBX-1 and MIC Primer Components and Ammunition Housings

    SBC: INNOVATIVE MATERIALS & PROCESSES INC            Topic: A19111

    Development of new lead-free replacements for lead styphnate and lead azide-based munition formulations made necessary to re-examine possible compatibility problems with current and future materials used for selecting adequate ammunition housings. Moreover, the compatibility/corrosion problems could be inherently associated with processing technology and therefore this aspect should be addressed b ...

    SBIR Phase I 2020 Department of DefenseArmy
  9. Dual-Voltage Lithium-Ion 6T Batteries for Low-voltage and High-voltage Applications

    SBC: SPEAR POWER SYSTEMS, INC            Topic: A18096

    The development of a modular, scalable battery system designed to support the Army’s 6T program will substantially reduce life cycle costs to the Army and DoD at large. Spear’s VoltFlex permits 6T lithium ion batteries to operate in either 24V or 48V modes. Spear’s novel switching mechanism identified in Phase I, will be further refined in Phase II and used in conjunction with the 24V and 48 ...

    SBIR Phase II 2019 Department of DefenseArmy
  10. Non-Explosive Non Nuclear Electro-Magnetic Pulse (EMP) Power Supply

    SBC: LOKI INC            Topic: A19081

    The overall technical objective of the phases of this effort, as stated in the solicitation, is to design and construct compact non-explosive power supplies that can be used to power HPM systems, and to conduct proof-of-principle demonstrations of those supplies. The main goal of our Phase I effort is to determine the technical feasibility of each of our proposed concepts early in the Phase, and t ...

    SBIR Phase I 2019 Department of DefenseArmy
US Flag An Official Website of the United States Government