You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.
SBC: The Associated Corp Topic: N/ATAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...
SBIR Phase I 1984 Department of DefenseNavy -
STANDARDIZED INTERACTIVE ELECTRONIC PRESENTATION OF WEAPON SYSTEM TROUBLESHOOTING
SBC: Hyper-view Systems Corp Topic: N/ATHIS PROPOSAL IDENTIFIES A STRATEGY, BASED ON NEW OFF-THE-SHELF TOOLS, PROTOTYPING, AND INTERACTION WITH MAINTENANCE PERSONNEL, FOR DEVELOPING INFORMATION PRESENTATION GUIDELINES WHICH SUPPORT MAINTENANCE PERSONNEL WITH VARIOUS EXPERIENCE LEVELS, THE ENVIRONMENTS IN WHICH THE MAINTENANCE IS PERFORMED, THE DIFFERENT MEDIA AVAILABLE FOR ONLINE INFORMATION DISPLAY, AND THE COST-EFFECTIVE OF IMPLEMENT ...
SBIR Phase I 1990 Department of DefenseNavy -
MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS
SBC: KVH INDUSTRIES, INC. Topic: N/AKVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...
SBIR Phase I 1990 Department of Transportation