You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DGPS-Based Trilateration Positioning Receiver

    SBC: Swaszek Peter            Topic: 07FH1

    Positioning and navigation have become a mainstay of everyday life in the U.S.; applications of interest include navigation of vehicles of all kinds, infrastructure mapping, and safety of life systems. Many of these recent applications have become possible through the GPS. With the recognized vulnerabilities of GPS, it is evident that equivalent backup systems must be developed. One possible so ...

    SBIR Phase I 2008 Department of Transportation
  2. HYBRIDOMA PRODUCTION BY ELECTRO-ACOUSTIC FUSION

    SBC: Chromogen, Inc            Topic: N/A

    THE USE OF ULTRASOUND STANDING WAVES TO FACILITATE PRODUCTION OF MAMMALIAN CELL-CELL HYBRIDS BY ELECTROFUSION HAS BEEN DEMONSTRATED. HOWEVER, NO EVIDENCE HAS BEEN PRESENTED THAT SUCH HYBRIDS ARE CULTIVABLE OR FUNCTIONAL. THE PROPOSAL SEEKS SUPPORT TO CREATE MOUSE-MOUSE HYBRIDOMAS BY ELECTROACOUSTIC FUSION AND BY ELECTROFUSION, TO CULTURE THE RESULTING HYBRIDOMAS FOR DETERMINATION OF RELATIVE YIELD ...

    SBIR Phase I 1989 National Science Foundation
  3. A NEW TOOL FOR ANALYZING EMBODIED TECHNOLOGICAL CHANGE AND ITS IMPLICATIONS FOR COMPETITIVENESS, OBSOLESCENCE, EMPLOYMENT, PROFITS AND THE STRUCTURE OF THE U.S. INDUSTRIALBASE.

    SBC: Joel Popkin And Company            Topic: N/A

    THE PURPOSE OF THE PROPOSED RESEARCH IS TO FUND THE FIRST PHASE OF THE DEVELOPMENT OF NEW ANALYTICAL TOOLS TO DETERMINE THE RANGE OF TECHNOLOGIES COEXISTING IN EACH OF THE FOUR-DIGIT U.S. MANUFACTURING INDUSTRIES AND THE EFFECT ON PRODUCTION COSTS AS THE LOWER COST TECHNOLOGIES REPLACE THE MORE COSTLY ONES. THE DIFFERENCES IN COSTS ASSOCIATED WITH EACH OF THE TECHNOLOGIES IN AN INDUSTRY, AND THE S ...

    SBIR Phase II 1989 National Science Foundation
  4. STTR PHASE I: Application of an Electrostatic Actuator Stable-Range-of-Motion Enhancement Control Law to Improve MEMS Gyroscopic Sensors

    SBC: MEMSense, LLC            Topic: EL

    This STTR Phase I research project will seek to significantly reduce the size and cost of MEMS gyroscopes through improving the internal electrostatic actuators. Specifically, this effort will commercialize Auburn University's patent protected technique for extending the stable range of motion of micromachined gap-closing actuators, so that the actuator size can be reduced while still producing th ...

    STTR Phase I 2008 National Science Foundation
  5. OCEAN WAVE ENERGY CONVERTER

    SBC: Ocean Wave Energy Co            Topic: N/A

    MAJOR AIDS TO NAVIGATION (ATON) ARE ESSENTIAL SIGNPOSTS FOR SAFE PASSAGE ALONG COASTAL AND OFFSHORE SEAWAYS. PRESENTLY, THEIR SIGNALS ARE POWERED BY ON-SITE ENGINE GENERATORS REQUIRING CONSIDERABLE AND COSTLY MAINTENANCE. ATON AUTONOMY WILL BE GREATLY INCREASED WITH DEEP DISCHARGE BATTERY TECHNOLOGY PROVIDING THAT ON-SITE CHARGING SOURCES ARE USED. AMONG NATURALLY AVAILABLE SOURCES, THE UNCEASING ...

    SBIR Phase I 1989 Department of Transportation
  6. SBIR Phase I: Algebra Immersion Robotics

    SBC: Tertl Studos LLC            Topic: IT

    This Small Business Innovation Research (SBIR) Phase I project will develop ways to leverage the teaching power of educational robotics to promote the learning of central big ideas in algebra. With its strong appeal and rich intellectual content, educational robotics has an established culture and following - but one that sits outside the educational mainstream. Considered a 'technology' activity, ...

    SBIR Phase I 2008 National Science Foundation
  7. SBIR Phase II: A Visual Language for Mathematical Model-Making

    SBC: Tertl Studos LLC            Topic: IT

    This Small Business Innovative Research (SBIR) Phase II project continues the development of a visual interface that allows students to construct and investigate mathematical models. This research is undertaken with the goal of creating a general-purpose environment in which students, teachers, and content developers may benefit from being able to create such models for classroom use. The specific ...

    SBIR Phase II 2008 National Science Foundation
US Flag An Official Website of the United States Government